OCD Permitting

[372834] EPIC ENERGY, L.L.C.

General Information
332 Road 3100
Aztec, NM 87410

U.S.A.

505-327-4892
505-327-9834
Well Operator
Facilities (49), Pits (58), Wells (468)
Contacts

Central Contact

Nancy Walden
Accountant
accounting@walsheng.net

505-327-4892

Nancy Walden


Hobbs Contact










Artesia Contact










Aztec Contact

Facilities (49), Pits (58), Wells (468)
Arleen Smith
Regulatory Specialist
arleen@walsheng.net

505-327-4892
505-787-9100
Arleen Smith


Santa Fe Contact









Natural Gas Capture Targets
Target Gas Capture Rate (%) Certified Gas Capture Rate (%) Notes
Upstream
North (Baseline Gas Capture Rate: 92.27%; Minimum Required Annual Gas Capture Increase: 1.15%)
2022 93.13 96.51
2023 94.57 -
2024 95.72 -
2025 96.87 -
2026 98.00 -

Baseline natural gas capture rates are based on the operator’s fourth quarter 2021 and first quarter 2022 quarterly reports.

Blanket Bond(s)
[92] CITIZENS BANK OF FARMINGTON
LOC
$125,000.00
Blanket Bond for Temporarily Abandoned Wells
No Active Blanket Bond for Temporarily Abandoned Wells
Single Well Bonds
No Single Well Bonds
Blanket Bond for Surface Waste Facilities
No Active Blanket Bond for Surface Waste Facilities
Facility Bonds
No Single Facility Bonds
Click to go back to top of page