| 2025 |
| December |
|
|
150 |
0 |
150 |
Flare |
Minor |
(12/08/2025) Initial C-129 Report Accepted |
|
|
130 |
0 |
130 |
Flare |
Minor |
(12/11/2025) Initial C-129 Report Accepted |
|
|
62 |
0 |
62 |
Flare |
Minor |
(12/12/2025) Initial C-129 Report Accepted |
|
|
71 |
0 |
71 |
Flare |
Minor |
(12/12/2025) Initial C-129 Report Accepted |
|
|
203 |
0 |
203 |
Flare |
Minor |
(12/15/2025) Initial C-129 Report Accepted |
|
|
0 |
52 |
52 |
Vent |
Minor |
(12/23/2025) Initial C-129 Report Accepted |
|
|
0 |
52 |
52 |
Vent |
Minor |
(12/23/2025) Initial C-129 Report Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
Notification Accepted |
|
Monthly Total:
December (8)
|
616 |
104 |
720 |
|
| November |
|
|
54 |
0 |
54 |
Flare |
Minor |
(11/16/2025) Initial C-129 Report Accepted |
|
|
126 |
0 |
126 |
Flare |
Minor |
(11/17/2025) Initial C-129 Report Accepted |
|
|
103 |
0 |
103 |
Flare |
Minor |
(11/17/2025) Initial C-129 Report Accepted |
|
|
97 |
0 |
97 |
Flare |
Minor |
(11/18/2025) Initial C-129 Report Accepted |
|
|
142 |
0 |
142 |
Flare |
Minor |
(11/18/2025) Initial C-129 Report Accepted |
|
|
125 |
0 |
125 |
Flare |
Minor |
(11/19/2025) Initial C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(11/28/2025) Initial C-129 Report Accepted |
|
|
273 |
0 |
273 |
Flare |
Minor |
(12/06/2025) Initial C-129 Report Accepted |
|
Monthly Total:
November (8)
|
1,001 |
0 |
1,001 |
|
| October |
|
|
2,881 |
0 |
2,881 |
Flare |
Major |
(10/13/2025) Amended C-129 Report Accepted |
|
|
258 |
0 |
258 |
Flare |
Minor |
(10/15/2025) Initial C-129 Report Accepted |
|
|
120 |
0 |
120 |
Flare |
Minor |
(10/15/2025) Initial C-129 Report Accepted |
|
|
521 |
0 |
521 |
Flare |
Major |
(10/17/2025) Amended C-129 Report Accepted |
|
|
364 |
0 |
364 |
Flare |
Minor |
(10/31/2025) Initial C-129 Report Accepted |
|
|
97 |
0 |
97 |
Flare |
Minor |
(11/13/2025) Amended C-129 Report Accepted |
|
|
74 |
0 |
74 |
Flare |
Minor |
(11/09/2025) Initial C-129 Report Accepted |
|
Monthly Total:
October (7)
|
4,315 |
0 |
4,315 |
|
| September |
|
|
280 |
0 |
280 |
Flare |
Minor |
(09/16/2025) Initial C-129 Report Accepted |
|
|
166 |
0 |
166 |
Flare |
Minor |
(09/19/2025) Initial C-129 Report Accepted |
|
|
114 |
0 |
114 |
Flare |
Minor |
(09/27/2025) Initial C-129 Report Accepted |
|
|
129 |
0 |
129 |
Flare |
Minor |
(09/28/2025) Initial C-129 Report Accepted |
|
|
108 |
0 |
108 |
Flare |
Minor |
(10/04/2025) Initial C-129 Report Accepted |
|
|
1,108 |
0 |
1,108 |
Flare |
Major |
(10/09/2025) Amended C-129 Report Accepted |
|
|
608 |
0 |
608 |
Flare |
Major |
(10/10/2025) Amended C-129 Report Accepted |
|
|
343 |
0 |
343 |
Flare |
Minor |
(10/12/2025) Initial C-129 Report Accepted |
|
Monthly Total:
September (8)
|
2,856 |
0 |
2,856 |
|
| August |
|
|
87 |
0 |
87 |
Flare |
Minor |
(08/11/2025) Initial C-129 Report Accepted |
|
|
894 |
0 |
894 |
Flare |
Major |
(08/11/2025) Amended C-129 Report Accepted |
|
|
1,843 |
0 |
1,843 |
Flare |
Major |
(08/14/2025) Amended C-129 Report Accepted |
|
|
397 |
0 |
397 |
Flare |
Minor |
(08/15/2025) Initial C-129 Report Accepted |
|
|
156 |
0 |
156 |
Flare |
Minor |
(08/19/2025) Initial C-129 Report Accepted |
|
|
422 |
0 |
422 |
Flare |
Minor |
(08/20/2025) Initial C-129 Report Accepted |
|
|
289 |
0 |
289 |
Flare |
Minor |
(08/22/2025) Initial C-129 Report Accepted |
|
Monthly Total:
August (7)
|
4,088 |
0 |
4,088 |
|
| July |
|
|
116 |
0 |
116 |
Flare |
Minor |
(07/11/2025) Initial C-129 Report Accepted |
|
|
62 |
0 |
62 |
Flare |
Minor |
(07/15/2025) Initial C-129 Report Accepted |
|
|
53 |
0 |
53 |
Flare |
Minor |
(07/16/2025) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(07/18/2025) Initial C-129 Report Accepted |
|
|
52 |
0 |
52 |
Flare |
Minor |
(07/18/2025) Initial C-129 Report Accepted |
|
|
55 |
0 |
55 |
Flare |
Minor |
(07/18/2025) Initial C-129 Report Accepted |
|
|
75 |
0 |
75 |
Flare |
Minor |
(07/18/2025) Initial C-129 Report Accepted |
|
|
333 |
0 |
333 |
Flare |
Minor |
(07/18/2025) Initial C-129 Report Accepted |
|
|
769 |
0 |
769 |
Flare |
Major |
(07/24/2025) Amended C-129 Report Accepted |
|
|
618 |
0 |
618 |
Flare |
Major |
(07/31/2025) Amended C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(08/06/2025) Initial C-129 Report Accepted |
|
|
82 |
0 |
82 |
Flare |
Minor |
(08/07/2025) Initial C-129 Report Accepted |
|
|
252 |
0 |
252 |
Flare |
Minor |
(08/10/2025) Initial C-129 Report Accepted |
|
|
69 |
0 |
69 |
Flare |
Minor |
(08/10/2025) Initial C-129 Report Accepted |
|
|
131 |
0 |
131 |
Flare |
Minor |
(08/10/2025) Initial C-129 Report Accepted |
|
Monthly Total:
July (15)
|
2,799 |
0 |
2,799 |
|
| June |
|
|
74 |
0 |
74 |
Flare |
Minor |
(06/09/2025) Initial C-129 Report Accepted |
|
|
277 |
0 |
277 |
Flare |
Minor |
(06/10/2025) Initial C-129 Report Accepted |
|
|
432 |
0 |
432 |
Flare |
Minor |
(06/26/2025) Initial C-129 Report Accepted |
|
|
354 |
0 |
354 |
Flare |
Minor |
(06/26/2025) Initial C-129 Report Accepted |
|
|
142 |
0 |
142 |
Flare |
Minor |
(06/27/2025) Initial C-129 Report Accepted |
|
|
643 |
0 |
643 |
Flare |
Major |
(06/28/2025) Amended C-129 Report Accepted |
|
|
111 |
0 |
111 |
Flare |
Minor |
(06/29/2025) Initial C-129 Report Accepted |
|
|
105 |
0 |
105 |
Flare |
Minor |
(06/30/2025) Initial C-129 Report Accepted |
|
|
918 |
0 |
918 |
Flare |
Major |
(07/01/2025) Amended C-129 Report Accepted |
|
|
1,553 |
0 |
1,553 |
Flare |
Major |
(07/02/2025) Amended C-129 Report Accepted |
|
|
533 |
0 |
533 |
Flare |
Major |
(07/03/2025) Amended C-129 Report Accepted |
|
|
84 |
0 |
84 |
Flare |
Minor |
(07/05/2025) Initial C-129 Report Accepted |
|
|
89 |
0 |
89 |
Flare |
Minor |
(07/05/2025) Initial C-129 Report Accepted |
|
|
92 |
0 |
92 |
Flare |
Minor |
(07/06/2025) Initial C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(07/06/2025) Initial C-129 Report Accepted |
|
|
90 |
0 |
90 |
Flare |
Minor |
(07/07/2025) Initial C-129 Report Accepted |
|
|
72 |
0 |
72 |
Flare |
Minor |
(07/09/2025) Initial C-129 Report Accepted |
|
|
53 |
0 |
53 |
Flare |
Minor |
(07/09/2025) Initial C-129 Report Accepted |
|
Monthly Total:
June (18)
|
5,700 |
0 |
5,700 |
|
| May |
|
|
313 |
0 |
313 |
Flare |
Minor |
(05/18/2025) Initial C-129 Report Accepted |
|
|
58 |
0 |
58 |
Flare |
Minor |
(05/27/2025) Initial C-129 Report Accepted |
|
|
57 |
0 |
57 |
Flare |
Minor |
(06/03/2025) Initial C-129 Report Accepted |
|
|
165 |
0 |
165 |
Flare |
Minor |
(06/06/2025) Initial C-129 Report Accepted |
|
Monthly Total:
May (4)
|
593 |
0 |
593 |
|
| April |
|
|
124 |
0 |
124 |
Flare |
Minor |
(04/13/2025) Initial C-129 Report Accepted |
|
|
109 |
0 |
109 |
Flare |
Minor |
(04/13/2025) Initial C-129 Report Accepted |
|
|
455 |
0 |
455 |
Flare |
Minor |
(04/14/2025) Initial C-129 Report Accepted |
|
|
96 |
0 |
96 |
Flare |
Minor |
(04/15/2025) Initial C-129 Report Accepted |
|
|
104 |
0 |
104 |
Flare |
Minor |
(04/16/2025) Initial C-129 Report Accepted |
|
|
112 |
0 |
112 |
Flare |
Minor |
(04/18/2025) Initial C-129 Report Accepted |
|
|
115 |
0 |
115 |
Flare |
Minor |
(04/18/2025) Initial C-129 Report Accepted |
|
|
167 |
0 |
167 |
Flare |
Minor |
(04/18/2025) Initial C-129 Report Accepted |
|
|
88 |
0 |
88 |
Flare |
Minor |
(04/20/2025) Initial C-129 Report Accepted |
|
|
71 |
0 |
71 |
Flare |
Minor |
(04/21/2025) Initial C-129 Report Accepted |
|
|
116 |
0 |
116 |
Flare |
Minor |
(04/21/2025) Initial C-129 Report Accepted |
|
|
82 |
0 |
82 |
Flare |
Minor |
(04/22/2025) Initial C-129 Report Accepted |
|
|
77 |
0 |
77 |
Flare |
Minor |
(04/23/2025) Initial C-129 Report Accepted |
|
|
83 |
0 |
83 |
Flare |
Minor |
(04/23/2025) Initial C-129 Report Accepted |
|
|
2,442 |
0 |
2,442 |
Flare |
Major |
(04/24/2025) Amended C-129 Report Accepted |
|
|
64 |
0 |
64 |
Flare |
Minor |
(04/25/2025) Initial C-129 Report Accepted |
|
|
63 |
0 |
63 |
Flare |
Minor |
(04/26/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(04/29/2025) Initial C-129 Report Accepted |
|
|
52 |
0 |
52 |
Flare |
Minor |
(04/29/2025) Initial C-129 Report Accepted |
|
|
51 |
0 |
51 |
Flare |
Minor |
(04/29/2025) Initial C-129 Report Accepted |
|
|
186 |
0 |
186 |
Flare |
Minor |
(05/01/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(05/05/2025) Initial C-129 Report Accepted |
|
Monthly Total:
April (22)
|
4,757 |
0 |
4,757 |
|
| March |
|
|
70 |
0 |
70 |
Flare |
Minor |
(03/14/2025) Initial C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(03/17/2025) Initial C-129 Report Accepted |
|
|
85 |
0 |
85 |
Flare |
Minor |
(03/17/2025) Initial C-129 Report Accepted |
|
|
52 |
0 |
52 |
Flare |
Minor |
(03/17/2025) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(03/18/2025) Initial C-129 Report Accepted |
|
|
53 |
0 |
53 |
Flare |
Minor |
(03/18/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(03/20/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(03/20/2025) Initial C-129 Report Accepted |
|
|
55 |
0 |
55 |
Flare |
Minor |
(03/24/2025) Initial C-129 Report Accepted |
|
|
57 |
0 |
57 |
Flare |
Minor |
(03/24/2025) Initial C-129 Report Accepted |
|
|
66 |
0 |
66 |
Flare |
Minor |
(03/26/2025) Initial C-129 Report Accepted |
|
|
439 |
0 |
439 |
Flare |
Minor |
(03/27/2025) Initial C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(03/28/2025) Initial C-129 Report Accepted |
|
|
61 |
0 |
61 |
Flare |
Minor |
(03/28/2025) Initial C-129 Report Accepted |
|
|
59 |
0 |
59 |
Flare |
Minor |
(03/30/2025) Initial C-129 Report Accepted |
|
|
139 |
0 |
139 |
Flare |
Minor |
(03/31/2025) Initial C-129 Report Accepted |
|
|
110 |
0 |
110 |
Flare |
Minor |
(03/31/2025) Initial C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(04/04/2025) Initial C-129 Report Accepted |
|
|
125 |
0 |
125 |
Flare |
Minor |
(04/04/2025) Initial C-129 Report Accepted |
|
|
421 |
0 |
421 |
Flare |
Minor |
(04/05/2025) Initial C-129 Report Accepted |
|
|
108 |
0 |
108 |
Flare |
Minor |
(04/05/2025) Initial C-129 Report Accepted |
|
|
58 |
0 |
58 |
Flare |
Minor |
(04/07/2025) Initial C-129 Report Accepted |
|
|
51 |
0 |
51 |
Flare |
Minor |
(04/07/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(04/08/2025) Initial C-129 Report Accepted |
|
|
517 |
0 |
517 |
Flare |
Major |
(04/08/2025) Amended C-129 Report Accepted |
|
Monthly Total:
March (25)
|
2,967 |
0 |
2,967 |
|
| February |
|
|
144 |
0 |
144 |
Flare |
Minor |
(02/12/2025) Initial C-129 Report Accepted |
|
|
189 |
0 |
189 |
Flare |
Minor |
(02/12/2025) Initial C-129 Report Accepted |
|
|
271 |
0 |
271 |
Flare |
Minor |
(02/12/2025) Initial C-129 Report Accepted |
|
|
118 |
0 |
118 |
Flare |
Minor |
(02/14/2025) Initial C-129 Report Accepted |
|
|
175 |
0 |
175 |
Flare |
Minor |
(02/14/2025) Initial C-129 Report Accepted |
|
|
233 |
0 |
233 |
Flare |
Minor |
(02/16/2025) Initial C-129 Report Accepted |
|
|
177 |
0 |
177 |
Flare |
Minor |
(02/16/2025) Initial C-129 Report Accepted |
|
|
126 |
0 |
126 |
Flare |
Minor |
(02/17/2025) Initial C-129 Report Accepted |
|
|
108 |
0 |
108 |
Flare |
Minor |
(02/18/2025) Initial C-129 Report Accepted |
|
|
183 |
0 |
183 |
Flare |
Minor |
(02/19/2025) Initial C-129 Report Accepted |
|
|
92 |
0 |
92 |
Flare |
Minor |
(02/19/2025) Initial C-129 Report Accepted |
|
|
67 |
0 |
67 |
Flare |
Minor |
(02/21/2025) Initial C-129 Report Accepted |
|
|
75 |
0 |
75 |
Flare |
Minor |
(02/24/2025) Initial C-129 Report Accepted |
|
|
63 |
0 |
63 |
Flare |
Minor |
(02/24/2025) Initial C-129 Report Accepted |
|
|
53 |
0 |
53 |
Flare |
Minor |
(02/24/2025) Initial C-129 Report Accepted |
|
|
61 |
0 |
61 |
Flare |
Minor |
(02/26/2025) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(02/26/2025) Initial C-129 Report Accepted |
|
|
57 |
0 |
57 |
Flare |
Minor |
(02/27/2025) Initial C-129 Report Accepted |
|
|
304 |
0 |
304 |
Flare |
Minor |
(02/28/2025) Initial C-129 Report Accepted |
|
|
67 |
0 |
67 |
Flare |
Minor |
(02/28/2025) Initial C-129 Report Accepted |
|
|
178 |
0 |
178 |
Flare |
Minor |
(03/03/2025) Initial C-129 Report Accepted |
|
|
94 |
0 |
94 |
Flare |
Minor |
(03/03/2025) Initial C-129 Report Accepted |
|
|
63 |
0 |
63 |
Flare |
Minor |
(03/04/2025) Initial C-129 Report Accepted |
|
|
55 |
0 |
55 |
Flare |
Minor |
(03/05/2025) Initial C-129 Report Accepted |
|
|
55 |
0 |
55 |
Flare |
Minor |
(03/05/2025) Initial C-129 Report Accepted |
|
|
50 |
0 |
50 |
Flare |
|
(03/06/2025) Initial C-129 Report Accepted |
|
|
57 |
0 |
57 |
Flare |
Minor |
(03/09/2025) Initial C-129 Report Accepted |
|
|
275 |
0 |
275 |
Flare |
Minor |
(03/09/2025) Initial C-129 Report Accepted |
|
Monthly Total:
February (28)
|
3,444 |
0 |
3,444 |
|
| January |
|
|
426 |
0 |
426 |
Flare |
Minor |
(01/14/2025) Initial C-129 Report Accepted |
|
|
344 |
0 |
344 |
Flare |
Minor |
(01/14/2025) Initial C-129 Report Accepted |
|
|
433 |
0 |
433 |
Flare |
Minor |
(01/14/2025) Initial C-129 Report Accepted |
|
|
795 |
0 |
795 |
Flare |
Major |
(01/15/2025) Amended C-129 Report Accepted |
|
|
402 |
0 |
402 |
Flare |
Minor |
(01/16/2025) Initial C-129 Report Accepted |
|
|
516 |
0 |
516 |
Flare |
Major |
(01/16/2025) Amended C-129 Report Accepted |
|
|
423 |
0 |
423 |
Flare |
Minor |
(01/17/2025) Initial C-129 Report Accepted |
|
|
406 |
0 |
406 |
Flare |
Minor |
(01/18/2025) Initial C-129 Report Accepted |
|
|
176 |
0 |
176 |
Flare |
Minor |
(01/18/2025) Initial C-129 Report Accepted |
|
|
593 |
0 |
593 |
Flare |
Major |
(01/19/2025) Amended C-129 Report Accepted |
|
|
155 |
0 |
155 |
Flare |
Minor |
(01/20/2025) Initial C-129 Report Accepted |
|
|
169 |
0 |
169 |
Flare |
Minor |
(01/20/2025) Initial C-129 Report Accepted |
|
|
169 |
0 |
169 |
Flare |
Minor |
(01/21/2025) Initial C-129 Report Accepted |
|
|
214 |
0 |
214 |
Flare |
Minor |
(01/21/2025) Initial C-129 Report Accepted |
|
|
147 |
0 |
147 |
Flare |
Minor |
(01/23/2025) Initial C-129 Report Accepted |
|
|
106 |
0 |
106 |
Flare |
Minor |
(01/23/2025) Initial C-129 Report Accepted |
|
|
132 |
0 |
132 |
Flare |
Minor |
(01/24/2025) Initial C-129 Report Accepted |
|
|
147 |
0 |
147 |
Flare |
Minor |
(01/27/2025) Initial C-129 Report Accepted |
|
|
374 |
0 |
374 |
Flare |
Minor |
(01/28/2025) Initial C-129 Report Accepted |
|
|
880 |
0 |
880 |
Flare |
Major |
(01/29/2025) Amended C-129 Report Accepted |
|
|
536 |
0 |
536 |
Flare |
Major |
(01/30/2025) Amended C-129 Report Accepted |
|
|
410 |
0 |
410 |
Flare |
Minor |
(01/31/2025) Initial C-129 Report Accepted |
|
|
305 |
0 |
305 |
Flare |
Minor |
(02/03/2025) Initial C-129 Report Accepted |
|
|
159 |
0 |
159 |
Flare |
Minor |
(02/04/2025) Initial C-129 Report Accepted |
|
|
119 |
0 |
119 |
Flare |
Minor |
(02/04/2025) Initial C-129 Report Accepted |
|
|
141 |
0 |
141 |
Flare |
Minor |
(02/05/2025) Initial C-129 Report Accepted |
|
|
126 |
0 |
126 |
Flare |
Minor |
(02/05/2025) Initial C-129 Report Accepted |
|
|
101 |
0 |
101 |
Flare |
Minor |
(02/06/2025) Initial C-129 Report Accepted |
|
|
154 |
0 |
154 |
Flare |
Minor |
(02/06/2025) Initial C-129 Report Accepted |
|
|
145 |
0 |
145 |
Flare |
Minor |
(02/10/2025) Initial C-129 Report Accepted |
|
|
212 |
0 |
212 |
Flare |
Minor |
(02/10/2025) Initial C-129 Report Accepted |
|
Monthly Total:
January (31)
|
9,415 |
0 |
9,415 |
|
|
Annual Total:
2025 (181)
|
42,551 |
104 |
42,655 |
|
| 2024 |
| December |
|
|
176 |
0 |
176 |
Flare |
Minor |
(12/13/2024) Initial C-129 Report Accepted |
|
|
416 |
0 |
416 |
Flare |
Minor |
(12/13/2024) Initial C-129 Report Accepted |
|
|
535 |
0 |
535 |
Flare |
Major |
(12/17/2024) Amended C-129 Report Accepted |
|
|
179 |
0 |
179 |
Flare |
Minor |
(12/19/2024) Initial C-129 Report Accepted |
|
|
166 |
0 |
166 |
Flare |
Minor |
(12/20/2024) Initial C-129 Report Accepted |
|
|
168 |
0 |
168 |
Flare |
Minor |
(12/20/2024) Initial C-129 Report Accepted |
|
|
218 |
0 |
218 |
Flare |
Minor |
(12/22/2024) Initial C-129 Report Accepted |
|
|
188 |
0 |
188 |
Flare |
Minor |
(12/24/2024) Initial C-129 Report Accepted |
|
|
214 |
0 |
214 |
Flare |
Minor |
(12/25/2024) Initial C-129 Report Accepted |
|
|
192 |
0 |
192 |
Flare |
Minor |
(12/27/2024) Initial C-129 Report Accepted |
|
|
256 |
0 |
256 |
Flare |
Minor |
(12/27/2024) Initial C-129 Report Accepted |
|
|
229 |
0 |
229 |
Flare |
Minor |
(12/29/2024) Initial C-129 Report Accepted |
|
|
205 |
0 |
205 |
Flare |
Minor |
(12/30/2024) Initial C-129 Report Accepted |
|
|
303 |
0 |
303 |
Flare |
Minor |
(12/30/2024) Initial C-129 Report Accepted |
|
|
553 |
0 |
553 |
Flare |
Major |
(01/01/2025) Amended C-129 Report Accepted |
|
|
490 |
0 |
490 |
Flare |
Minor |
(01/02/2025) Initial C-129 Report Accepted |
|
|
1,372 |
0 |
1,372 |
Flare |
Major |
(01/02/2025) Amended C-129 Report Accepted |
|
|
243 |
0 |
243 |
Flare |
Minor |
(01/03/2025) Initial C-129 Report Accepted |
|
|
360 |
0 |
360 |
Flare |
Minor |
(01/03/2025) Initial C-129 Report Accepted |
|
|
290 |
0 |
290 |
Flare |
Minor |
(01/06/2025) Initial C-129 Report Accepted |
|
|
376 |
0 |
376 |
Flare |
Minor |
(01/07/2025) Initial C-129 Report Accepted |
|
|
214 |
0 |
214 |
Flare |
Minor |
(01/08/2025) Initial C-129 Report Accepted |
|
|
209 |
0 |
209 |
Flare |
Minor |
(01/08/2025) Initial C-129 Report Accepted |
|
|
203 |
0 |
203 |
Flare |
Minor |
(01/08/2025) Initial C-129 Report Accepted |
|
|
204 |
0 |
204 |
Flare |
Minor |
(01/10/2025) Initial C-129 Report Accepted |
|
|
199 |
0 |
199 |
Flare |
Minor |
(01/10/2025) Initial C-129 Report Accepted |
|
|
217 |
0 |
217 |
Flare |
Minor |
(01/13/2025) Initial C-129 Report Accepted |
|
|
213 |
0 |
213 |
Flare |
Minor |
(01/13/2025) Initial C-129 Report Accepted |
|
|
602 |
0 |
602 |
Flare |
Major |
(01/14/2025) Amended C-129 Report Accepted |
|
Monthly Total:
December (29)
|
9,190 |
0 |
9,190 |
|
| November |
|
|
59 |
0 |
59 |
Flare |
Minor |
(11/14/2024) Initial C-129 Report Accepted |
|
|
212 |
0 |
212 |
Flare |
Minor |
(11/15/2024) Initial C-129 Report Accepted |
|
|
161 |
0 |
161 |
Flare |
Minor |
(11/15/2024) Initial C-129 Report Accepted |
|
|
198 |
0 |
198 |
Flare |
Minor |
(11/25/2024) Initial C-129 Report Accepted |
|
|
100 |
0 |
100 |
Flare |
Minor |
(11/25/2024) Initial C-129 Report Accepted |
|
|
159 |
0 |
159 |
Flare |
Minor |
(11/25/2024) Initial C-129 Report Accepted |
|
|
191 |
0 |
191 |
Flare |
Minor |
(11/28/2024) Initial C-129 Report Accepted |
|
|
201 |
0 |
201 |
Flare |
Minor |
(11/30/2024) Initial C-129 Report Accepted |
|
|
195 |
0 |
195 |
Flare |
Minor |
(12/02/2024) Initial C-129 Report Accepted |
|
|
186 |
0 |
186 |
Flare |
Minor |
(12/02/2024) Initial C-129 Report Accepted |
|
|
723 |
0 |
723 |
Flare |
Major |
(12/03/2024) Amended C-129 Report Accepted |
|
|
197 |
0 |
197 |
Flare |
Minor |
(12/03/2024) Initial C-129 Report Accepted |
|
|
204 |
0 |
204 |
Flare |
Minor |
(12/05/2024) Initial C-129 Report Accepted |
|
|
168 |
0 |
168 |
Flare |
Minor |
(12/05/2024) Initial C-129 Report Accepted |
|
|
182 |
0 |
182 |
Flare |
Minor |
(12/05/2024) Initial C-129 Report Accepted |
|
|
189 |
0 |
189 |
Flare |
Minor |
(12/05/2024) Initial C-129 Report Accepted |
|
|
194 |
0 |
194 |
Flare |
Minor |
(12/08/2024) Initial C-129 Report Accepted |
|
Monthly Total:
November (17)
|
3,519 |
0 |
3,519 |
|
| October |
|
|
63 |
0 |
63 |
Flare |
Minor |
(10/15/2024) Initial C-129 Report Accepted |
|
|
1,502 |
0 |
1,502 |
Flare |
Major |
(10/22/2024) Amended C-129 Report Accepted |
|
|
542 |
0 |
542 |
Flare |
Major |
(10/22/2024) Amended C-129 Report Accepted |
|
|
258 |
0 |
258 |
Flare |
Minor |
(10/24/2024) Initial C-129 Report Accepted |
|
|
187 |
0 |
187 |
Flare |
Minor |
(10/24/2024) Initial C-129 Report Accepted |
|
|
66 |
0 |
66 |
Flare |
Minor |
(10/25/2024) Initial C-129 Report Accepted |
|
|
72 |
0 |
72 |
Flare |
Minor |
(10/27/2024) Initial C-129 Report Accepted |
|
|
490 |
0 |
490 |
Flare |
Minor |
(10/27/2024) Initial C-129 Report Accepted |
|
|
79 |
0 |
79 |
Flare |
Minor |
(11/07/2024) Initial C-129 Report Accepted |
|
|
167 |
0 |
167 |
Flare |
Minor |
(11/08/2024) Initial C-129 Report Accepted |
|
|
113 |
0 |
113 |
Flare |
Minor |
(11/09/2024) Initial C-129 Report Accepted |
|
Monthly Total:
October (11)
|
3,539 |
0 |
3,539 |
|
| September |
|
|
109 |
0 |
109 |
Flare |
Minor |
(09/24/2024) Initial C-129 Report Accepted |
|
|
461 |
0 |
461 |
Flare |
Minor |
(09/27/2024) Initial C-129 Report Accepted |
|
|
90 |
0 |
90 |
Flare |
Minor |
(09/30/2024) Initial C-129 Report Accepted |
|
|
105 |
0 |
105 |
Flare |
Minor |
(10/01/2024) Initial C-129 Report Accepted |
|
|
616 |
0 |
616 |
Flare |
Major |
(10/03/2024) Amended C-129 Report Accepted |
|
|
1,193 |
0 |
1,193 |
Flare |
Major |
(10/03/2024) Amended C-129 Report Accepted |
|
|
78 |
0 |
78 |
Flare |
Minor |
(10/04/2024) Initial C-129 Report Accepted |
|
|
514 |
0 |
514 |
Flare |
Major |
(10/04/2024) Amended C-129 Report Accepted |
|
Monthly Total:
September (8)
|
3,166 |
0 |
3,166 |
|
| August |
|
|
377 |
0 |
377 |
Flare |
Minor |
(08/12/2024) Initial C-129 Report Accepted |
|
|
264 |
0 |
264 |
Flare |
Minor |
(08/13/2024) Initial C-129 Report Accepted |
|
|
956 |
0 |
956 |
Flare |
Major |
(08/19/2024) Amended C-129 Report Accepted |
|
|
901 |
0 |
901 |
Flare |
Major |
(08/20/2024) Amended C-129 Report Accepted |
|
|
286 |
0 |
286 |
Flare |
Minor |
(08/20/2024) Initial C-129 Report Accepted |
|
|
309 |
0 |
309 |
Flare |
Minor |
(08/21/2024) Initial C-129 Report Accepted |
|
|
144 |
0 |
144 |
Flare |
Minor |
(08/23/2024) Initial C-129 Report Accepted |
|
|
84 |
0 |
84 |
Flare |
Minor |
(08/25/2024) Initial C-129 Report Accepted |
|
|
126 |
0 |
126 |
Flare |
Minor |
(08/28/2024) Initial C-129 Report Accepted |
|
|
178 |
0 |
178 |
Flare |
Minor |
(08/28/2024) Initial C-129 Report Accepted |
|
|
148 |
0 |
148 |
Flare |
Minor |
(08/29/2024) Initial C-129 Report Accepted |
|
|
130 |
0 |
130 |
Flare |
Minor |
(08/30/2024) Initial C-129 Report Accepted |
|
|
114 |
0 |
114 |
Flare |
Minor |
(09/03/2024) Initial C-129 Report Accepted |
|
|
317 |
0 |
317 |
Flare |
Minor |
(09/04/2024) Initial C-129 Report Accepted |
|
Monthly Total:
August (14)
|
4,334 |
0 |
4,334 |
|
| July |
|
|
579 |
0 |
579 |
Flare |
Major |
(07/10/2024) Amended C-129 Report Accepted |
|
|
1,186 |
0 |
1,186 |
Flare |
Major |
(07/10/2024) Amended C-129 Report Accepted |
|
|
836 |
0 |
836 |
Flare |
Major |
(07/11/2024) Amended C-129 Report Accepted |
|
|
3,320 |
0 |
3,320 |
Flare |
Major |
(07/11/2024) Amended C-129 Report Accepted |
|
|
4,648 |
0 |
4,648 |
Flare |
Major |
(07/12/2024) Amended C-129 Report Accepted |
|
|
499 |
0 |
499 |
Flare |
Minor |
(07/12/2024) Initial C-129 Report Accepted |
|
|
671 |
0 |
671 |
Flare |
Major |
(07/14/2024) Amended C-129 Report Accepted |
|
|
240 |
0 |
240 |
Flare |
Minor |
(07/14/2024) Initial C-129 Report Accepted |
|
|
274 |
0 |
274 |
Flare |
Minor |
(07/15/2024) Initial C-129 Report Accepted |
|
|
121 |
0 |
121 |
Flare |
Minor |
(07/15/2024) Initial C-129 Report Accepted |
|
|
136 |
0 |
136 |
Flare |
Minor |
(07/16/2024) Initial C-129 Report Accepted |
|
|
152 |
0 |
152 |
Flare |
Minor |
(07/17/2024) Initial C-129 Report Accepted |
|
|
101 |
0 |
101 |
Flare |
Minor |
(07/17/2024) Initial C-129 Report Accepted |
|
|
137 |
0 |
137 |
Flare |
Minor |
(07/18/2024) Initial C-129 Report Accepted |
|
|
202 |
0 |
202 |
Flare |
Minor |
(07/28/2024) Initial C-129 Report Accepted |
|
|
150 |
0 |
150 |
Flare |
Minor |
(07/29/2024) Initial C-129 Report Accepted |
|
|
437 |
0 |
437 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
404 |
0 |
404 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
69 |
0 |
69 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
85 |
0 |
85 |
Flare |
Minor |
(07/30/2024) Initial C-129 Report Accepted |
|
|
1,944 |
0 |
1,944 |
Flare |
Major |
(07/31/2024) Amended C-129 Report Accepted |
|
|
253 |
0 |
253 |
Flare |
Minor |
(07/31/2024) Initial C-129 Report Accepted |
|
|
701 |
0 |
701 |
Flare |
Major |
(08/02/2024) Amended C-129 Report Accepted |
|
|
2,693 |
0 |
2,693 |
Flare |
Major |
(08/03/2024) Amended C-129 Report Accepted |
|
|
1,965 |
0 |
1,965 |
Flare |
Major |
(08/03/2024) Amended C-129 Report Accepted |
|
|
108 |
0 |
108 |
Flare |
Minor |
(08/11/2024) Initial C-129 Report Accepted |
|
Monthly Total:
July (26)
|
21,911 |
0 |
21,911 |
|
| June |
|
|
166 |
0 |
166 |
Flare |
Minor |
(06/10/2024) Initial C-129 Report Accepted |
|
|
79 |
0 |
79 |
Flare |
Minor |
(06/17/2024) Initial C-129 Report Accepted |
|
|
2,462 |
0 |
2,462 |
Flare |
Major |
(06/18/2024) Amended C-129 Report Accepted |
|
|
140 |
0 |
140 |
Flare |
Minor |
(06/18/2024) Initial C-129 Report Accepted |
|
|
89 |
0 |
89 |
Flare |
Minor |
(06/22/2024) Initial C-129 Report Accepted |
|
|
121 |
0 |
121 |
Flare |
Minor |
(06/24/2024) Initial C-129 Report Accepted |
|
|
184 |
0 |
184 |
Flare |
Minor |
(06/25/2024) Initial C-129 Report Accepted |
|
|
129 |
0 |
129 |
Flare |
Minor |
(06/26/2024) Initial C-129 Report Accepted |
|
|
1,154 |
0 |
1,154 |
Flare |
Major |
(06/26/2024) Amended C-129 Report Accepted |
|
|
705 |
0 |
705 |
Flare |
Major |
(06/26/2024) Amended C-129 Report Accepted |
|
|
1,464 |
0 |
1,464 |
Flare |
Major |
(07/01/2024) Amended C-129 Report Accepted |
|
|
406 |
0 |
406 |
Flare |
Minor |
(07/03/2024) Initial C-129 Report Accepted |
|
|
565 |
0 |
565 |
Flare |
Major |
(07/03/2024) Amended C-129 Report Accepted |
|
|
165 |
0 |
165 |
Flare |
Minor |
(07/04/2024) Initial C-129 Report Accepted |
|
|
1,366 |
0 |
1,366 |
Flare |
Major |
(07/04/2024) Amended C-129 Report Accepted |
|
|
454 |
0 |
454 |
Flare |
Minor |
(07/04/2024) Initial C-129 Report Accepted |
|
|
968 |
0 |
968 |
Flare |
Major |
(07/08/2024) Amended C-129 Report Accepted |
|
|
714 |
0 |
714 |
Flare |
Major |
(07/08/2024) Amended C-129 Report Accepted |
|
|
501 |
0 |
501 |
Flare |
Major |
(07/09/2024) Amended C-129 Report Accepted |
|
Monthly Total:
June (19)
|
11,832 |
0 |
11,832 |
|
| May |
|
|
89 |
0 |
89 |
Flare |
Minor |
(05/23/2024) Initial C-129 Report Accepted |
|
|
325 |
0 |
325 |
Flare |
Minor |
(05/25/2024) Initial C-129 Report Accepted |
|
|
632 |
0 |
632 |
Flare |
Major |
(05/25/2024) Amended C-129 Report Accepted |
|
|
92 |
0 |
92 |
Flare |
Minor |
(05/26/2024) Initial C-129 Report Accepted |
|
|
84 |
0 |
84 |
Flare |
Minor |
(05/28/2024) Initial C-129 Report Accepted |
|
|
302 |
0 |
302 |
Flare |
Minor |
(05/29/2024) Initial C-129 Report Accepted |
|
|
51 |
0 |
51 |
Flare |
Minor |
(05/29/2024) Initial C-129 Report Accepted |
|
|
100 |
0 |
100 |
Flare |
Minor |
(05/31/2024) Initial C-129 Report Accepted |
|
|
314 |
0 |
314 |
Flare |
Minor |
(05/31/2024) Initial C-129 Report Accepted |
|
|
1,772 |
0 |
1,772 |
Flare |
Major |
(06/02/2024) Amended C-129 Report Accepted |
|
|
1,318 |
0 |
1,318 |
Flare |
Major |
(06/07/2024) Amended C-129 Report Accepted |
|
|
214 |
0 |
214 |
Flare |
Minor |
(06/09/2024) Initial C-129 Report Accepted |
|
|
675 |
0 |
675 |
Flare |
Major |
(06/10/2024) Amended C-129 Report Accepted |
|
Monthly Total:
May (13)
|
5,968 |
0 |
5,968 |
|
| April |
|
|
74 |
0 |
74 |
Flare |
Minor |
(04/10/2024) Initial C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(04/21/2024) Initial C-129 Report Accepted |
|
|
0 |
0 |
0 |
Flare |
Major |
(04/27/2024) Cancellation Request Accepted |
|
|
185 |
0 |
185 |
Flare |
Minor |
(05/06/2024) Initial C-129 Report Accepted |
|
|
7,569 |
0 |
7,569 |
Flare |
Major |
(05/07/2024) Amended C-129 Report Accepted |
|
|
3,074 |
0 |
3,074 |
Flare |
Major |
(05/08/2024) Amended C-129 Report Accepted |
|
Monthly Total:
April (5)
|
10,983 |
0 |
10,983 |
|
| March |
|
|
121 |
0 |
121 |
Flare |
Minor |
(03/13/2024) Initial C-129 Report Accepted |
|
|
838 |
0 |
838 |
Flare |
Major |
(03/15/2024) Amended C-129 Report Accepted |
|
|
838 |
0 |
838 |
Flare |
Major |
(03/15/2024) Amended C-129 Report Accepted |
|
|
106 |
0 |
106 |
Flare |
Minor |
(03/16/2024) Initial C-129 Report Accepted |
|
|
1,382 |
0 |
1,382 |
Flare |
Major |
(03/16/2024) Amended C-129 Report Accepted |
|
|
138 |
0 |
138 |
Flare |
Minor |
(03/19/2024) Initial C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(03/19/2024) Initial C-129 Report Accepted |
|
|
516 |
0 |
516 |
Flare |
Major |
(03/20/2024) Amended C-129 Report Accepted |
|
|
648 |
0 |
648 |
Flare |
Major |
(03/22/2024) Amended C-129 Report Accepted |
|
|
166 |
0 |
166 |
Flare |
Minor |
(03/23/2024) Initial C-129 Report Accepted |
|
|
331 |
0 |
331 |
Flare |
Minor |
(03/25/2024) Initial C-129 Report Accepted |
|
|
67 |
0 |
67 |
Flare |
Minor |
(03/25/2024) Initial C-129 Report Accepted |
|
|
718 |
0 |
718 |
Flare |
Major |
(03/26/2024) Amended C-129 Report Accepted |
|
|
571 |
0 |
571 |
Flare |
Major |
(03/27/2024) Amended C-129 Report Accepted |
|
|
81 |
0 |
81 |
Flare |
Minor |
(03/29/2024) Initial C-129 Report Accepted |
|
|
359 |
0 |
359 |
Flare |
Minor |
(03/30/2024) Initial C-129 Report Accepted |
|
|
101 |
0 |
101 |
Flare |
Minor |
(04/02/2024) Initial C-129 Report Accepted |
|
|
54 |
0 |
54 |
Flare |
Minor |
(04/07/2024) Initial C-129 Report Accepted |
|
|
1,322 |
0 |
1,322 |
Flare |
Major |
(04/08/2024) Amended C-129 Report Accepted |
|
|
1,154 |
0 |
1,154 |
Flare |
Major |
(04/09/2024) Amended C-129 Report Accepted |
|
Monthly Total:
March (20)
|
9,592 |
0 |
9,592 |
|
|
Annual Total:
2024 (162)
|
84,034 |
0 |
84,034 |
|
| Grand Total: |
126,585 |
104 |
126,689 |
|