OCD Permitting

Cases Scheduled for Commission Hearing for Thursday, September 7, 2023

Below is a preliminary list of cases schedule to be heard at this OCC hearing. A party desiring to use projection equipment at the hearing shall contact Florene Davidson, OCD Clerk, no later than seven (7) business days prior to the hearing.

Case No. Description
1. 23727 Application of Targa Northern Delaware LLC for Rehearing of Order No. R-13507-E, Lea County, New Mexico. Targa Northern Delaware LLC (“Targa”) requests that the Oil Conservation Commission reconsider conditions included in Order No. R-13507-E that impose certain requirements regarding monitoring of the Government L Com #001 Well (API 30-025-25604) in relation to Targa’s operation of the Red Hills AGI #1 Well.
2. 23686 Application of Chevron USA Inc. for approval of salt water disposal well in Lea County, New Mexico. Applicant seeks an order approving the Papa Squirrel State SWD #1 well at a surface location 1,928’ from the South line and 870’ from the West line, Unit L, Section 13, Township 26 South, Range 32 East, NMPM, Lea County, New Mexico for the purpose of operating a salt water disposal well. Injection formations will be the Bell Canyon/Cherry Canyon/Brushy Canyon from 4625 feet to 8939 feet. The tubing packer will be set at 4525 feet, and production casing and cement will be set at 8500 feet. The maximum anticipated injection rate will be 20,000 BWPD and maximum surface injection pressure will be 925 psi. Said area is located approximately 26 miles west of Jal, New Mexico.
3. 23687 Application of Chevron USA Inc. for approval of salt water disposal well in Eddy County, New Mexico. Applicant seeks an order approving the Severitas 2 State SWD #1 well at a surface location 185’ from the North line and 1,082’ from the East line, Unit A, Section 2, Township 26 South, Range 27 East, NMPM, Eddy County, New Mexico for the purpose of operating a salt water disposal well. Injection formations will be the Bell Canyon/Cherry Canyon/Brushy Canyon from 2343 feet to 6012 feet. The tubing packer will be set at 2243 feet, and production casing and cement will be set at 5500 feet. The maximum anticipated injection rate will be 15,000 bwpd and maximum surface injection pressure will be 468 psi. Said location is approximately 13 miles southwest of Malaga, New Mexico.
Click to go back to top of page