02/22/2022 |
Closure Report Approved, Release Resolved. |
02/22/2022 |
The (02/22/2022, C-141) application [29426] was accepted by OCD. The operator was emailed with details of this event. |
02/22/2022 |
An application [29426] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
05/25/2021 |
The (02/22/2022, C-141) application [29426] was assigned to this incident. |
02/25/2021 |
C-141 received on 5/25/2021 for release on 02/25/2021. The cause of the release was reported as “A hole resulting from internal corrosion was discovered in the pipeline. It was shut in and the leak has been repaired.” |
02/25/2021 |
The (02/25/2021, NOR) application [19065] was accepted by OCD. The operator was emailed with details of this event. |
02/25/2021 |
An application [19065] was submitted to OCD for review. It was submitted, indicating that it was an: [NOR] Notification of a release The operator was emailed confirmation of this event. |
02/25/2021 |
The (02/25/2021, NOR) application [19065] was assigned to this incident. |
02/25/2021 |
Release discovered by the operator. |
02/25/2021 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
02/25/2021 |
New incident created by the operator, upon the submission of notification of release. |