nAPP2109856543 TT LINE

General Incident Information

[fAPP2123031660] DCP SE NM Gathering System
[36785] DCP OPERATING COMPANY, LP
Active
Notification Accepted, Pending submission of Initial C-141 from the operator
Other

C-18-22S-37E      0 FNL      0 FEL
32.398951,-103.203177 NAD83
Hobbs
Private
Lea (25)


Severity Indicators














Notes

Industry Rep


Contact Details


Event Dates

04/07/2021

4/22/2021

07/06/2021  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Notification [23504] 04/08/2021 04/08/2021

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Vehicular Accident Pipeline (Any) Condensate 89 25 64 BBL
Vehicular Accident Pipeline (Any) [OBSOLETE] Natural Gas (Methane) 45 0 45 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        
Cause of Release OR Additional Details provided for materials released:
Vehicle hit pipeline riser

Incident Events

Date Detail
04/08/2021 The (04/08/2021, NOR) application [23504] was assigned to this incident.
04/08/2021 Additional Details provided by the operator: Vehicle hit pipeline riser
04/08/2021 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
04/08/2021 New incident created by the operator, upon the submission of notification of release.
04/07/2021 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No
From paragraph A. Major release determine using:
        (1) an unauthorized release of a volume, excluding gases, of 25 barrels or more.

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found