05/09/2021 |
The (05/09/2021, C-141) application [25280] was accepted by OCD. The operator was emailed with details of this event. |
05/09/2021 |
An application [25280] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
04/22/2021 |
The (05/09/2021, C-141) application [25280] was assigned to this incident. |
04/09/2021 |
The (04/09/2021, NOR) application [23582] was assigned to this incident. |
04/09/2021 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: False.
- The impacted area has been secured to protect human health and the environment: False.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: False.
- All free liquids and recoverable materials have been removed and managed appropriately: False.
- If all the actions described above have not been undertaken, explain why:
|
04/09/2021 |
New incident created by the operator, upon the submission of notification of release. |
04/08/2021 |
C-141 received on 04/22/2021 for release on 4/8/2021. The cause of the release was reported as “Failed coating on piping. Anodes and piping replaced. The leak has been repaired.” |
04/08/2021 |
Release discovered by the operator. |