OCD Permitting

NAPP2123949534 2021 MAJOR I VENT @ 0

General Incident Information


[fAPP2123052765] HARVEST FOUR CORNERS GATHER SYSTEM
[373888] Harvest Four Corners, LLC
Initial C-129 Accepted, Operator required to follow Monthly/Annual Waste Rule reporting requirements
Vent

Aztec
Major
Indian
San Juan (45)

L-23-32N-12W      0 FNL      0 FEL
36.96816,-108.072301 NAD83


Notes

Industry Rep















Contact Details


Event Dates

08/15/2021
05:22 PM

08/15/2021
11:56 PM
8/30/2021

 

Incident Dates

Type Action Received Denied Approved
Initial C-129 Report [43704] 08/27/2021 08/27/2021
Notification [43704] 08/27/2021 08/27/2021

Compositional Analysis of Vented and/or Flared Natural Gas

Date Methane
(CH4) %
Nitrogen
(N2) %
Hydrogen Suffide
(H2S) PPM
Carbon Dioxide
(CO2) %
Oxygen
(O2) %
Natural Gas Analysis 08/27/2021 85 0 0 2 0

Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Other Pipeline (Any) Natural Gas Vented 1384 0 1384 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
08/27/2021 The (08/27/2021, C-129) application [43704] was assigned to this incident.
08/27/2021 Corrective actions provided by the operator: Tie in was relocated and pipeline was lowered while the line was out of service to prevent this issue from happening again.
08/27/2021 Primary Equipment identified by the operator (Pipeline (Any))
08/27/2021 Steps taken to prevent waste provided by the operator: Upon discovery, Harvest immediately isolated the leaking section of pipe to stop the release.
08/27/2021 New incident created by the operator, upon the submission of a venting of natural gas report.
08/15/2021 The venting of natural gas discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions






Orders No Orders Found