02/28/2022 |
Corrective actions provided by the operator: Harvest has insulated the vent valve in an effort to prevent future freezes. Harvest is also in the process of converting venting ESD systems to non-venting SSD systems at the majority of its facilities. |
02/28/2022 |
Primary Equipment identified by the operator (Valve) |
02/28/2022 |
Steps taken to prevent waste provided by the operator: After gas control remotely discovered this gas release, Harvest personnel were immediately dispatched to the site. Upon arrival at the site, Harvest personnel closed the venting valve, terminating the gas loss event. |
02/28/2022 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
02/28/2022 |
The (02/28/2022, C-129A) application [84708] was assigned to this incident. |
02/27/2022 |
The (02/27/2022, NOMVF) application [84521] was assigned to this incident. |
02/27/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |
02/27/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |