| 07/19/2022 |
The (07/19/2022, C-141) application [123793] was accepted by OCD. The operator was emailed with details of this event. |
| 07/19/2022 |
Closure Report Approved. Going forward, please delineate laterally to the accepted criteria, in this case, lateral delineation to 600 mg/kg or less of chloride (S-8, S-10, & S-13). |
| 07/19/2022 |
An application [123793] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 07/08/2022 |
The (07/19/2022, C-141) application [123793] was assigned to this incident. |
| 05/25/2022 |
OCD approved a 30-day extension to July 8, 2022 to submit a closure report. |
| 05/04/2022 |
The (05/04/2022, C-141) application [94796] was rejected by OCD. The operator was emailed with details of this event. |
| 05/04/2022 |
Remediation Plan Denied. Vertical and horizontal delineation needs to be completed prior to remediation. Please resubmit a revised Remediation Plan by June 6, 2022. |
| 05/04/2022 |
An application [94796] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 03/31/2022 |
The (05/04/2022, C-141) application [94796] was assigned to this incident. |
| 03/31/2022 |
The (03/31/2022, NOR) application [94517] was assigned to this incident. |
| 03/31/2022 |
Additional Details provided by the operator: A valve broke on the makeup water tank in 2018 and the tank overflowed. |
| 03/31/2022 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
| 03/31/2022 |
New incident created by the operator, upon the submission of notification of release. |
| 06/23/2020 |
C-141 received on 3/31/2022 for release on 06/23/2020. The cause of the release was reported as “A valve broke on the makeup water tank in 2008 and the tank overflowed”. |
| 06/23/2020 |
Release discovered by the operator. |