03/23/2023 |
The (03/23/2023, C-141) application [178918] was accepted by OCD. The operator was emailed with details of this event. |
03/23/2023 |
Closure Approved. |
03/23/2023 |
An application [178918] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
01/24/2023 |
The (03/23/2023, C-141) application [178918] was assigned to this incident. |
07/25/2022 |
The Closure Report is denied. The Closure Report has incident number NAPP2207642850 on the report and C-141 forms, which has already been approved. If this report is for incident number NAPP2212529806, the report and C-141 forms will need to include the correct incident number. |
07/25/2022 |
The (07/25/2022, C-141) application [127668] was rejected by OCD. The operator was emailed with details of this event. |
07/25/2022 |
An application [127668] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
07/21/2022 |
The (07/25/2022, C-141) application [127668] was assigned to this incident. |
05/05/2022 |
The (05/05/2022, C-141) application [104293] was accepted by OCD. The operator was emailed with details of this event. |
05/05/2022 |
An application [104293] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
05/05/2022 |
The (05/05/2022, C-141) application [104293] was assigned to this incident. |
05/05/2022 |
The (05/05/2022, NOR) application [104281] was assigned to this incident. |
05/05/2022 |
Operator indicated that immediate notice was given (04/21/2022) prior to the submission of the NOR. |
05/05/2022 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
05/05/2022 |
New incident created by the operator, upon the submission of notification of release. |
04/20/2022 |
C-141 received on 5/5/2022 for release on 04/20/2022. The cause of the release was reported as “The release was caused by a failed alarm causing overflowed tanks.
The release was within a falcon lined facility and on pad. A vacuum truck was dispatched to remove all freestanding fluids.
Evaluation will be made at the site to determine if we may commence remediation immediately or delineate any possible impact from the release and we will present a remediation work plan to the NMOCD for approval prior to any significant remediation activities”. |
04/20/2022 |
Release discovered by the operator. |