08/28/2023 |
App ID 224263: Closure Report Approved, Release Resolved. |
08/28/2023 |
The (08/28/2023, C-141) application [224263] was accepted by OCD. The operator was emailed with details of this event. |
08/28/2023 |
An application [224263] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
06/06/2023 |
The (08/28/2023, C-141) application [224263] was assigned to this incident. |
04/19/2023 |
OCD approved a 60-day extension request to June 30, 2023 to submit a closure report. |
01/20/2023 |
The (01/20/2023, C-141) application [169617] was accepted by OCD. The operator was emailed with details of this event. |
01/20/2023 |
Remediation Plan Approved with Conditions. Variance approved for chloride analyses only. Composite confirmation soil samples will be collected from the bottom of the excavation from areas representing no more than four hundred (400) square feet. Composite confirmation samples will be collected from the sidewalls of the excavation from areas representing no more than two hundred (200) square feet. |
01/20/2023 |
An application [169617] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
12/22/2022 |
The (01/20/2023, C-141) application [169617] was assigned to this incident. |
11/22/2022 |
The (11/22/2022, C-141) application [154050] was rejected by OCD. The operator was emailed with details of this event. |
11/22/2022 |
Remediation Plan Denied. Please provide OCD information on how impacted soils at PH04 at 8 feet bgs will be addressed. Anything other than excavation requires prior OCD approval. OCD will require bottom/floor confirmation soil samples be collected at 4' to ensure chloride concentrations have not exceeded criteria. Please resubmit a revised Remediation Plan to the OCD portal by December 22, 2022. |
11/22/2022 |
An application [154050] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
10/26/2022 |
The (11/22/2022, C-141) application [154050] was assigned to this incident. |
05/05/2022 |
The (05/05/2022, C-141) application [104337] was accepted by OCD. The operator was emailed with details of this event. |
05/05/2022 |
An application [104337] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
05/05/2022 |
The (05/05/2022, C-141) application [104337] was assigned to this incident. |
05/05/2022 |
The (05/05/2022, NOR) application [104326] was assigned to this incident. |
05/05/2022 |
Operator indicated that immediate notice was given (04/29/2022) prior to the submission of the NOR. |
05/05/2022 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
05/05/2022 |
New incident created by the operator, upon the submission of notification of release. |
04/28/2022 |
C-141 received on 5/5/2022 for release on 04/28/2022. The cause of the release was reported as “The release was caused by a flowline failure due to maintenance issues.
The release was off pad. No fluids were recovered due to sandy soil”. |
04/28/2022 |
Release discovered by the operator. |