OCD Permitting

nAPP2213935065 M-31 LINE

General Incident Information

[fAPP2123031660] DCP SE NM Gathering System
[36785] DCP OPERATING COMPANY, LP
Active
Remediation Plan Approved, Pending submission of Remediation Closure Report from the operator
Natural Gas Release

M-25-18S-31E      0 FNL      0 FEL
32.712359,-103.82785 NAD83
Artesia
Federal
Eddy (15)


Severity Indicators














Notes

Industry Rep
Referred to Environmental Inspector


Contact Details

Stephen W. Weathers

Event Dates

05/16/2022

5/31/2022

09/19/2023  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Remediation Plan 02/20/2023 06/21/2023
Initial C-141 Report 02/20/2023 02/20/2023
Notification 05/19/2022 05/19/2022

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Blow Out Pipeline (Any) Condensate 25 0 25 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
06/21/2023 The Remediation Plan is Conditionally Approved. The Variance Request for 500 ft2 floor confirmation sample size is approved. This includes the Release Area and the Overspray Area. Collect sidewall confirmation samples, representing no more than 200 ft2. Floor confirmation samples should be delineated/excavated to meet closure criteria standards for site assessment/characterization/proven depth to water determination. Sidewall/Edge samples should be delineated/excavated to 600 mg/kg for chlorides and 100 mg/kg for TPH to define the edge of the release. All samples must be analyzed for all constituents listed in Table I of 19.15.29.12 NMAC. The work will need to occur in 90 days after the work plan has been reviewed.
06/21/2023 The (06/21/2023, C-141) application [188316] was accepted by OCD. The operator was emailed with details of this event.
06/21/2023 An application [188316] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
02/20/2023 The (06/21/2023, C-141) application [188316] was assigned to this incident.
05/19/2022 The (05/19/2022, NOR) application [108416] was assigned to this incident.
05/19/2022 Operator indicated that immediate notice was given (05/17/2022) prior to the submission of the NOR.
05/19/2022 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
05/19/2022 New incident created by the operator, upon the submission of notification of release.
05/16/2022 C-141 received on 2/20/2023 for release on 05/16/2022. The cause of the release was reported as “Line was pinched causing it to rupture”.
05/16/2022 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No
From paragraph A. Major release determine using:
        (1) an unauthorized release of a volume, excluding gases, of 25 barrels or more.

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found