06/12/2023 |
Corrective actions provided by the operator: part of the piping was replaced |
06/12/2023 |
Primary Equipment identified by the operator (Pipeline (Any), with additional details: this is for existing event fAPP2123031660, nAPP2214358412 submission ID 109640) |
06/12/2023 |
Steps taken to prevent waste provided by the operator: the small leak was on a fuel line and was unable to be taken down without planning and an outage of upstream producers. |
06/12/2023 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
06/12/2023 |
The (06/12/2023, C-129A) application [226632] was assigned to this incident. |
05/23/2022 |
The (05/23/2022, NOMVF) application [109640] was assigned to this incident. |
05/23/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |
05/23/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |