07/18/2022 |
Additional Details provided by the operator: No//Down VRU |
07/18/2022 |
Corrective actions provided by the operator: Corrective actions are site specific but work to establish the best VRU run time |
07/18/2022 |
Steps taken to prevent waste provided by the operator: Event is site specific but if present, work to get VRU back on line |
07/18/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
07/18/2022 |
The (07/18/2022, C-129A) application [126074] was assigned to this incident. |
05/25/2022 |
The (05/25/2022, C-129) application [110631] was assigned to this incident. |
05/25/2022 |
Additional Details provided by the operator: No//Down VRU |
05/25/2022 |
Corrective actions provided by the operator: Corrective actions are site specific but work to establish the best VRU run time |
05/25/2022 |
Steps taken to prevent waste provided by the operator: Event is site specific but if present, work to get VRU back on line |
05/25/2022 |
New incident created by the operator, upon the submission of a venting of natural gas report. |
05/23/2022 |
The venting of natural gas discovered by the operator. |