| 06/23/2022 |
Closure Report Approved, Release Resolved. |
| 06/23/2022 |
The (06/23/2022, C-141) application [115438] was accepted by OCD. The operator was emailed with details of this event. |
| 06/23/2022 |
An application [115438] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 06/09/2022 |
The (06/23/2022, C-141) application [115438] was assigned to this incident. |
| 06/03/2022 |
The (06/03/2022, NOR) application [113470] was assigned to this incident. |
| 06/03/2022 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices:
- All free liquids and recoverable materials have been removed and managed appropriately:
- If all the actions described above have not been undertaken, explain why:
|
| 06/03/2022 |
New incident created by the operator, upon the submission of notification of release. |
| 05/27/2022 |
C-141 received on 6/9/2022 for release on 05/27/2022. The cause of the release was reported as “Gasket failure on the demethanizer reboiler caused a release of natural gas liquids. No liquids reached the ground as it
turned to vapor before anything accumulated”. |
| 05/27/2022 |
Release discovered by the operator. |