OCD Permitting

nAPP2216235265 M-3-4 LINE 4.5" POLY

General Incident Information

[fAPP2123031660] DCP SE NM Gathering System
[36785] DCP OPERATING COMPANY, LP
Active
Notification Accepted, Pending submission of Initial C-141 from the operator
Natural Gas Release

M-17-20S-34E      0 FNL      0 FEL
32.566702,-103.589304 NAD83
Hobbs
Federal
Lea (25)


Severity Indicators














Notes

Industry Rep


Contact Details


Event Dates

06/10/2022

6/27/2022

09/08/2022  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Notification 06/11/2022 06/11/2022

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Corrosion Pipeline (Any) Condensate 37 25 12 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
06/11/2022 The (06/11/2022, NOR) application [116001] was assigned to this incident.
06/11/2022 Operator indicated that immediate notice was given (06/10/2022) prior to the submission of the NOR.
06/11/2022 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
06/11/2022 New incident created by the operator, upon the submission of notification of release.
06/10/2022 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No
From paragraph A. Major release determine using:
        (1) an unauthorized release of a volume, excluding gases, of 25 barrels or more.

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found