03/14/2023 |
The (03/14/2023, C-129C) application [196780] was rejected by OCD. The operator was emailed with details of this event. |
03/14/2023 |
The (03/14/2023, C-129C) application [196780] was returned to under OCD review. |
03/14/2023 |
Incident cancelled by the operator, upon the submission of a [C-129] Cancel Venting and/or Flaring (C-129C) report. |
03/14/2023 |
The (03/14/2023, C-129C) application [196780] was assigned to this incident. |
06/20/2022 |
The (06/20/2022, C-129) application [118887] was assigned to this incident. |
06/20/2022 |
Corrective actions provided by the operator: Corrective actions are site specific but work to establish the best VRU run time |
06/20/2022 |
Steps taken to prevent waste provided by the operator: Event is site specific but if present, work to get VRU back on line |
06/20/2022 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
06/13/2022 |
The flaring of natural gas discovered by the operator. |