| 09/09/2022 |
Corrective actions provided by the operator: Repair, reset , restart |
| 09/09/2022 |
Steps taken to prevent waste provided by the operator: Repaired |
| 09/09/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 09/09/2022 |
The (09/09/2022, C-129A) application [142029] was assigned to this incident. |
| 07/15/2022 |
Corrective actions provided by the operator: Repair, reset , restart |
| 07/15/2022 |
Steps taken to prevent waste provided by the operator: Repaired |
| 07/15/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/15/2022 |
The (07/15/2022, C-129A) application [125955] was assigned to this incident. |
| 07/02/2022 |
The (07/02/2022, NOMVF) application [122468] was assigned to this incident. |
| 07/02/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 07/01/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |