OCD Permitting

NAPP2219450906 SAN JUAN 31-6 #16N @ 0

General Incident Information
SAN JUAN 31-6 #16N

[fAPP2123052765] HARVEST FOUR CORNERS GATHER SYSTEM
[373888] Harvest Four Corners, LLC
Cancellation Request Approved, Cancelled
Natural Gas Release

Aztec

Federal
Rio Arriba (39)

A-32-31N-06W      0 FNL      0 FEL
36.859800001,-107.479000001 NAD83


Notes

Industry Rep















Contact Details


Event Dates

07/12/2022

7/27/2022

10/10/2022  

Incident Dates

Type Action Received Denied Approved
Cancellation Request 07/20/2022 07/20/2022
Notification 07/13/2022 07/13/2022

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Corrosion Pipeline (Any) Produced Water 1 0 1 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
07/20/2022 Incident cancelled after additional information was collected by Harvest, it was determined that the gas released during this incident was below reportable levels (calculation submitted via email). Calculation inserted within the incident file.
07/13/2022 The (07/13/2022, NOR) application [125138] was assigned to this incident.
07/13/2022 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
07/13/2022 New incident created by the operator, upon the submission of notification of release.
07/12/2022 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found


Click to go back to top of page