09/26/2022 |
Corrective actions provided by the operator: Harvest has removed the corroded section of pipeline. This section was replaced with new pipe. All welds were taped and a rock shield was applied. |
09/26/2022 |
Primary Equipment identified by the operator (Pipeline (Any)) |
09/26/2022 |
Steps taken to prevent waste provided by the operator: Harvest was notified of this leak by the third party conducting the aerial leak detection survey. The leak was detected on 9/2, but Harvest was not notified until 9/14. After notification, Harvest immediately dispatched a group to investigate the potential leak. Once the leak was confirmed, Harvest immediately isolated the pipeline and stopped the release. |
09/26/2022 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
09/26/2022 |
The (09/26/2022, C-129A) application [146109] was assigned to this incident. |
09/14/2022 |
The (09/14/2022, NOMVF) application [143517] was assigned to this incident. |
09/14/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |
09/14/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |