OCD Permitting

nAPP2226554892 B-26 LINE LEAK

General Incident Information

[fAPP2123031660] DCP SE NM Gathering System
[36785] DCP OPERATING COMPANY, LP
Active
Initial C-141 Approved, Pending submission of Site Characterization / Remediation Plan OR Remediation Closure Report from the operator
Natural Gas Release

F-18-19S-29E      0 FNL      0 FEL
32.663186,-104.11511 NAD83
Artesia
State
Eddy (15)


Severity Indicators














Notes

Industry Rep
Referred to Environmental Inspector


Contact Details

Stephen W. Weathers

Event Dates

09/21/2022

10/6/2022

12/20/2022  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Initial C-141 Report 09/28/2022 09/28/2022
Notification 09/22/2022 09/22/2022

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Corrosion Pipeline (Any) Condensate 33 3 30 BBL
Corrosion Pipeline (Any) Natural Gas Vented 7 0 7 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
09/28/2022 The (09/28/2022, C-141) application [146862] was accepted by OCD. The operator was emailed with details of this event.
09/28/2022 An application [146862] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
09/28/2022 The (09/28/2022, C-141) application [146862] was assigned to this incident.
09/22/2022 The (09/22/2022, NOR) application [145670] was assigned to this incident.
09/22/2022 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
09/22/2022 New incident created by the operator, upon the submission of notification of release.
09/21/2022 C-141 received on 9/28/2022. for release on 09/21/2022. The cause of the release was reported as “Natural gas condensate was discovered on the B-26 pipeline and subsequently reported to DCP. A notification of the release was submitted to the NMOCD within 24-hours via the OCD online portal. DCP personnel shut in the pipeline to prevent additional release of natural gas and natural gas condensate until the line could be repaired and returned to service”.
09/21/2022 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No
From paragraph A. Major release determine using:
        (1) an unauthorized release of a volume, excluding gases, of 25 barrels or more.

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

No remediation plan data was found for this incident.

No active remediation deferral request was found for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found


Click to go back to top of page