| 12/23/2022 |
Corrective actions provided by the operator: HP flare due to blowing down Gas lift compressor. LP flare volume due to blower being off. MP flare due to #1,2 VRUs down and not having enough HP to buck line pressure. |
| 12/23/2022 |
Steps taken to prevent waste provided by the operator: HP flare due to blowing down Gas lift compressor. LP flare volume due to blower being off. MP flare due to #1,2 VRUs down and not having enough HP to buck line pressure. |
| 12/23/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 12/19/2022 |
The (12/23/2022, C-129A) application [168460] was assigned to this incident. |
| 12/19/2022 |
The (12/19/2022, NOMVF) application [168446] was assigned to this incident. |
| 12/19/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 12/15/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |