| 01/08/2023 |
Corrective actions provided by the operator: HP flare due to blowing down GL compressor 3 times.
LP flare vol due to blower being off. MP flare due to removal of small VRUs 1,2. In the process of installing 200 hp VRU #1, new VRU should be in service today. Troubleshooting GL compressor, 2nd stage scrubber will not dump fluid correctly. |
| 01/08/2023 |
Steps taken to prevent waste provided by the operator: HP flare due to blowing down GL compressor 3 times.
LP flare vol due to blower being off. MP flare due to removal of small VRUs 1,2. In the process of installing 200 hp VRU #1, new VRU should be in service today. Troubleshooting GL compressor, 2nd stage scrubber will not dump fluid correctly. |
| 01/08/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 12/19/2022 |
The (01/08/2023, C-129A) application [168463] was assigned to this incident. |
| 12/19/2022 |
The (12/19/2022, NOMVF) application [168452] was assigned to this incident. |
| 12/19/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 12/18/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |