12/30/2022 |
Corrective actions provided by the operator: Review past occurrences and share lessons learned whether it be formation gas, equipment/operational failures, or facility design issues |
12/30/2022 |
Steps taken to prevent waste provided by the operator: Monitor in real time when applicable and when alarmed, identify and work to resolve the source causing the poor gas quality |
12/30/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
12/30/2022 |
The (12/30/2022, C-129A) application [171267] was assigned to this incident. |
12/30/2022 |
Additional Details provided by the operator: No/Down VRU |
12/30/2022 |
Corrective actions provided by the operator: Corrective actions are site specific but work to establish the best VRU run time |
12/30/2022 |
Steps taken to prevent waste provided by the operator: Event is site specific but if present, work to get VRU back on line |
12/30/2022 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
12/30/2022 |
The (12/30/2022, C-129A) application [171262] was assigned to this incident. |
12/28/2022 |
The (12/28/2022, NOMVF) application [170389] was assigned to this incident. |
12/28/2022 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
12/23/2022 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |