nAPP2300343390 PLU 28 BIG SINKS EAST TANK BATTERY

General Incident Information

[fAPP2207539371] PLU 28 BS EAST BTY
[5380] XTO ENERGY, INC
Active
Remediation Closure Report Approved, Pending submission of Reclamation Report from the operator
Oil Release

H-28-25S-31E      0 FNL      0 FEL
32.10371,-103.77792 NAD83
Artesia
Federal
Eddy (15)


Severity Indicators














Notes

Industry Rep
Referred to Environmental Inspector


Contact Details

Garrett Green
SSHE Coordinator

Event Dates

12/22/2022

1/6/2023

06/27/2023  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Remediation Closure Report 06/27/2023 12/20/2023
Sampling Notice [473663] 06/12/2025 06/12/2025
Initial C-141 Report 01/03/2023 01/03/2023
Notification 01/03/2023

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Freeze Valve Crude Oil 20 0 20 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
06/12/2025 The (06/12/2025, C-141N) application [473663] was assigned to this incident.
12/20/2023 We have received your Remediation Closure Report for Incident #NAPP2300343390 PLU 28 BIG SINKS EAST TANK BATTERY, thank you. This Remediation Closure Report is approved. Areas reasonably needed for production or subsequent drilling operations will need to be reclaimed and revegetated as soon as they are no longer reasonably needed. A report for reclamation and revegetation including pictures of the contoured backfilled excavation surface and a thorough discussion on reseeding mixture, vegetation ratio, timelines, etc.., will need to be submitted and approved prior to this incident receiving the final status of "Restoration Complete".
12/20/2023 The (12/20/2023, C-141) application [233240] was accepted by OCD. The operator was emailed with details of this event.
12/20/2023 An application [233240] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
06/27/2023 The (12/20/2023, C-141) application [233240] was assigned to this incident.
06/21/2023 Your request for an extension to June 27th, 2023 is approved. This will be the final extension for this release. Please include this e-mail correspondence in the remediation and/or closure report.
06/21/2023 XTO is providing a Site update for PLU 28 Big Sinks East (Incident Number nAPP2300343390). The release was discovered on December 22, 2022 an extension request was approved through yesterday 6/20/23. Site assessment, delineation and excavation of impacted soil is completed, however, final laboratory analytical reports are pending, though expected to be received today, June 21, 2023. Once the final analytical data is received XTO will finalize the Closure Request detailing remediation work completed and submit to the NMOCD portal. XTO is requesting a 7 day extension to 6/27/2023 to finalize the report and submit to the portal.
03/29/2023 Your request for an extension to June 20th, 2023 is approved. Please include this e-mail correspondence in the remediation and/or closure report.
03/29/2023 XTO is requesting an extension for the current deadline of March 22, 2023, for submitting a remediation work plan or closure report required in 19.15.29.12.B.(1) NMAC for PLU 28 Big Sinks East (Incident Number nAPP2300343390). The release was discovered on December 22, 2022. Initial site assessment activities and remediation activities have been ongoing and based on the most recent laboratory analytical reports, additional work is warranted. To complete additional remediation activities and submit a remediation work plan or closure report, XTO requests a 90-day extension of this deadline until June 20, 2023.
01/03/2023 The (01/03/2023, C-141) application [171710] was accepted by OCD. The operator was emailed with details of this event.
01/03/2023 An application [171710] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
01/03/2023 The (01/03/2023, C-141) application [171710] was assigned to this incident.
01/03/2023 The (01/03/2023, NOR) application [171706] was assigned to this incident.
01/03/2023 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
01/03/2023 New incident created by the operator, upon the submission of notification of release.
12/22/2022 C-141 received on 1/3/2023 for release on 12/22/2022. The cause of the release was reported as “A regulator valve on the main sales line froze, causing vessel to overpressure sending fluid out of the PRV. No fluids were recovered. A third-party contractor has been retained for remediation purposes”.
12/22/2022 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

Remediation Plan

Have the lateral and vertical extents of contamination been fully delineated? Yes No
On what estimated date will the remediation commence?  
On what date will (or did) the final sampling occur?  
On what date will (or was) the remediation complete(d)  

Release is indicated as not yet fully delineated. Any Deferral Requests received may not be granted for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found