| 03/14/2023 |
Corrective actions provided by the operator: Repair, reset , restart |
| 03/14/2023 |
Steps taken to prevent waste provided by the operator: Repaired |
| 03/14/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 03/14/2023 |
The (03/14/2023, C-129A) application [197090] was assigned to this incident. |
| 01/25/2023 |
Corrective actions provided by the operator: Repair, reset , restart |
| 01/25/2023 |
Steps taken to prevent waste provided by the operator: Repaired |
| 01/25/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 01/25/2023 |
The (01/25/2023, C-129A) application [179438] was assigned to this incident. |
| 01/15/2023 |
The (01/15/2023, NOMVF) application [176134] was assigned to this incident. |
| 01/15/2023 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 01/14/2023 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |