nAPP2303347848 STRANGER 34 CTB 3

General Incident Information

[fAPP2219241788] STRANGER 34 CTB 3
[6137] DEVON ENERGY PRODUCTION COMPANY, LP
Active
Remediation Closure Report Received, Pending OCD Review
Other

O-34-25S-34E      1032 FSL      2477 FEL
32.0825416,-103.4572685 NAD83
Hobbs
Federal
Lea (25)


Severity Indicators














Notes

Industry Rep
Referred to Environmental Inspector


Contact Details

Dale Woodall

Event Dates

02/02/2023

2/17/2023

05/03/2023  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Remediation Closure Report 08/29/2023
Initial C-141 Report 02/15/2023 02/15/2023
Notification 02/02/2023 02/02/2023

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Equipment Failure Flow Line - Production Produced Water 14 5 9 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
12/11/2023 App ID 258435: Remediation has met 19.15.29 NMAC requirements. Soil impacts exceeding the reclamation standards have been left in place and are required to meet 19.15.29.13D (1) NMAC once the site is no longer reasonably needed for production or subsequent drilling ops.
12/11/2023 The (12/11/2023, C-141) application [258435] was accepted by OCD. The operator was emailed with details of this event.
12/11/2023 An application [258435] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
08/29/2023 The (12/11/2023, C-141) application [258435] was assigned to this incident.
02/17/2023 The (02/17/2023, C-141) application [186527] was accepted by OCD. The operator was emailed with details of this event.
02/17/2023 An application [186527] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
02/15/2023 The (02/17/2023, C-141) application [186527] was assigned to this incident.
02/02/2023 C-141 received on 2/15/2023 for release on 02/02/2023. The cause of the release was reported as “Water line developed leak. Fluid stayed on pad”.
02/02/2023 The (02/02/2023, NOR) application [182078] was assigned to this incident.
02/02/2023 Release discovered by the operator.
02/02/2023 Additional Details provided by the operator: Operator arrived on site and saw water spraying from a main water line. A pin hole was created on a main 6" water line. 14.3 bbls released on pad. spill did not go offsite. 5 bbls recovered. Fluids remained onsite. Leak was stopped by isolating the line.
02/02/2023 Initial Response question & answers at the time of notification were as follows.
  • The source of the release has been stopped: True.
  • The impacted area has been secured to protect human health and the environment: True.
  • Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
  • All free liquids and recoverable materials have been removed and managed appropriately: True.
02/02/2023 New incident created by the operator, upon the submission of notification of release.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

Remediation Plan

Have the lateral and vertical extents of contamination been fully delineated? Yes No
On what estimated date will the remediation commence?  
On what date will (or did) the final sampling occur?  
On what date will (or was) the remediation complete(d)  

Release is indicated as not yet fully delineated. Any Deferral Requests received may not be granted for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.