| 05/09/2023 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 05/09/2023 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 05/09/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 05/09/2023 |
The (05/09/2023, C-129A) application [215228] was assigned to this incident. |
| 03/10/2023 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 03/10/2023 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 03/10/2023 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 03/10/2023 |
The (03/10/2023, C-129A) application [195678] was assigned to this incident. |
| 03/02/2023 |
The (03/02/2023, NOMVF) application [192312] was assigned to this incident. |
| 03/02/2023 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 03/01/2023 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |