| 01/17/2024 |
XTO’s deferral requests final remediation for Incident Numbers NAPP2308136642 until the site is reconstructed, and/or the well pad is abandoned. Ensolum and XTO do not believe deferment will result in imminent risk to human health, the environment, or groundwater. The area requested for deferral is the impacted soil underneath the surface piping, where remediation would require a major facility deconstruction (Figure 4). The area has been delineated and documented in the report. At this time, OCD approves this request. The Deferral Request and C-141 will be accepted for record and marked accordingly. The release will remain open in OCD database files and reflect an open environmental issue. |
| 01/17/2024 |
The (01/17/2024, C-141) application [247760] was accepted by OCD. The operator was emailed with details of this event. |
| 01/17/2024 |
An application [247760] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 08/03/2023 |
The (01/17/2024, C-141) application [247760] was assigned to this incident. |
| 06/09/2023 |
Your request for an extension to August 12th, 2023 is approved. Please include this e-mail correspondence in the remediation and/or closure report. |
| 06/09/2023 |
XTO is requesting an extension of the current deadline of June 13, 2023, for submitting a remediation work plan or closure report required in 19.15.29.12.B.(1) NMAC for the Nash Deep East (Incident Number nAPP2308136642). The release occurred on March 15, 2023, and as a result, approximately 7.43 barrels of produced water was released in an area surrounding process piping and active production equipment on pad. An initial site assessment and delineation sampling has been completed at the site. Excavation activities are currently ongoing and laboratory analytical results for confirmation soil samples is pending. To provide time to review analytical results and submit a remediation work plan or closure report, XTO requests a 60-day extension of this deadline until August 12, 2023. |
| 03/22/2023 |
The (03/22/2023, C-141) application [199675] was accepted by OCD. The operator was emailed with details of this event. |
| 03/22/2023 |
An application [199675] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 03/22/2023 |
The (03/22/2023, C-141) application [199675] was assigned to this incident. |
| 03/22/2023 |
The (03/22/2023, NOR) application [199658] was assigned to this incident. |
| 03/22/2023 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
| 03/22/2023 |
New incident created by the operator, upon the submission of notification of release. |
| 03/15/2023 |
C-141 received on 3/22/2023 for release on 03/15/2023. The cause of the release was reported as “A pinhole leak formed on the 6" water line due to corrosion, releasing fluids to pad. A vacuum truck recovered all free fluids. A third-party contractor has been retained for remediation purposes”. |
| 03/15/2023 |
Release discovered by the operator. |