OCD Permitting

NAPP2310556334 2023 MAJOR I VENT @ 0

General Incident Information


[fAPP2123052765] HARVEST FOUR CORNERS GATHER SYSTEM
[373888] Harvest Four Corners, LLC
Amended C-129 Accepted, Operator required to follow Monthly/Annual Waste Rule reporting requirements
Vent

Aztec
Major

Rio Arriba (39)

C-31-29N-05W      0 FNL      0 FEL
36.688144,-107.402092 NAD83


Notes

Industry Rep















Contact Details


Event Dates

04/14/2023
07:00 PM

04/14/2023
07:10 PM
5/1/2023

 

Incident Dates

Type Action Received Denied Approved
Initial C-129 Report [208970] 04/19/2023 04/19/2023
Notification [208054] 04/15/2023 04/15/2023

Compositional Analysis of Vented and/or Flared Natural Gas

Date Methane
(CH4) %
Nitrogen
(N2) %
Hydrogen Suffide
(H2S) PPM
Carbon Dioxide
(CO2) %
Oxygen
(O2) %
Natural Gas Analysis 04/19/2023 89 0 0 10 0

Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Other (Specify) 0 0 0
Equipment Failure Valve Natural Gas Vented 4586 0 4586 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
04/19/2023 Corrective actions provided by the operator: PSV was re-tested and passed on the next business day. Testing showed that the PSV should have relieved just below 650 psi. PSV was adjusted to be within 3% of the 650 psi set pressure
04/19/2023 Primary Equipment identified by the operator (Valve)
04/19/2023 Steps taken to prevent waste provided by the operator: Immediately upon discovery, Harvest personnel pinched back the block valve to get the PSV to reset, stopping the gas release
04/19/2023 Incident updated by the operator, upon the submission of a amendment for venting of natural gas report.
04/19/2023 The (04/19/2023, C-129A) application [208970] was assigned to this incident.
04/15/2023 The (04/15/2023, NOMVF) application [208054] was assigned to this incident.
04/15/2023 New incident created by the operator, upon the submission of a notification of venting or flaring.
04/14/2023 The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions






Orders No Orders Found