OCD Permitting

NAPP2320548007 2023 MINOR I VENT @ 0

General Incident Information


[fAPP2123052765] HARVEST FOUR CORNERS GATHER SYSTEM
[373888] Harvest Four Corners, LLC
Initial C-129 Accepted, Operator required to follow Monthly/Annual Waste Rule reporting requirements
Vent

Aztec
Minor

Rio Arriba (39)

A-04-25N-05W      0 FNL      0 FEL
36.426400001,-107.362000001 NAD83


Notes

Industry Rep















Contact Details


Event Dates

07/12/2023
12:00 PM

07/12/2023
12:30 PM
7/27/2023

 

Incident Dates

Type Action Received Denied Approved
Initial C-129 Report [243670] 07/24/2023 07/24/2023
Notification [243670] 07/24/2023 07/24/2023

Compositional Analysis of Vented and/or Flared Natural Gas

Date Methane
(CH4) %
Nitrogen
(N2) %
Hydrogen Suffide
(H2S) PPM
Carbon Dioxide
(CO2) %
Oxygen
(O2) %
Natural Gas Analysis 07/24/2023 80 0 0 1 0

Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Normal Operations Tank (Any) Natural Gas Vented 60 0 60 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
07/24/2023 The (07/24/2023, C-129) application [243670] was assigned to this incident.
07/24/2023 Corrective actions provided by the operator: upon discovery of leak operations traced the leak in the facility and determined that it was a dump controller leaking internally. Scrubber dump was found and shut in unit was taken down for repairs to be made. Repairs included the replacement of the nor seal controller.
07/24/2023 Primary Equipment identified by the operator (Gas Compressor Station, with additional details: Third stage dump controller leaking internally, leaking to tank)
07/24/2023 Steps taken to prevent waste provided by the operator: upon discovery of leak operations traced the leak in the facility and determined that it was a dump controller leaking internally. Scrubber dump was found and shut in unit was taken down for repairs to be made. Repairs included the replacement of the nor seal controller.
07/24/2023 New incident created by the operator, upon the submission of a venting of natural gas report.
07/12/2023 The venting of natural gas discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions






Orders No Orders Found


Click to go back to top of page