| 02/19/2024 |
XTO’s deferral requests final remediation for Incident Number NAPP2320634792 until final reclamation of the well pad or major construction. Ensolum and XTO do not believe deferment will result in imminent risk to human health, the environment, or groundwater. The area requested for deferral is in the immediate vicinity of active production equipment and process piping within the release area, where remediation would require a major facility deconstruction (Figure 4). The area has been delineated and documented in the report. At this time, OCD approves this request. The Deferral Request and C-141 will be accepted for record and marked accordingly. The release will remain open in OCD database files and reflect an open environmental issue. |
| 02/19/2024 |
The (02/19/2024, C-141) application [273340] was accepted by OCD. The operator was emailed with details of this event. |
| 02/19/2024 |
An application [273340] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 10/06/2023 |
The (02/19/2024, C-141) application [273340] was assigned to this incident. |
| 07/25/2023 |
The (07/25/2023, C-141) application [243985] was accepted by OCD. The operator was emailed with details of this event. |
| 07/25/2023 |
C-141 received on 7/25/2023 for release on 7/12/2023. The cause of the release was reported as “Interior corrosion on the 6" tester water line caused fluids to release to pad. A vac truck was dispatched and recovered standing fluid. A third-party contractor has been retained for remediation purposes.” |
| 07/25/2023 |
An application [243985] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 07/25/2023 |
The (07/25/2023, C-141) application [243985] was assigned to this incident. |
| 07/25/2023 |
The (07/25/2023, NOR) application [243977] was assigned to this incident. |
| 07/25/2023 |
Additional Details provided by the operator: Interior corrosion on the 6” tester water line caused fluids to release to pad. |
| 07/25/2023 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
| 07/25/2023 |
New incident created by the operator, upon the submission of notification of release. |
| 07/12/2023 |
Release discovered by the operator. |