06/25/2024 |
App ID 352192: Remediation closure report approved, release resolved. |
06/25/2024 |
The (06/25/2024, C-141) application [352192] was accepted by OCD. The operator was emailed with details of this event. |
06/25/2024 |
An application [352192] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
06/24/2024 |
The (06/24/2024, C-141N) application [357089] was assigned to this incident. |
06/07/2024 |
The (06/25/2024, C-141) application [352192] was assigned to this incident. |
03/07/2024 |
Closure denied. OCD has calculated the base of the excavation to be 312 square feet and only 1 five-point composite confirmation/final sample was collected and does not comply with 19.15.29.12 D.(1)(c) NMAC, which states "Alternately, without division approval, the responsible party may elect to perform a composite and grab sample plan of the remediated area where each composite sample is not representative of more than 200 square feet."
Pursuant to 19.15.29.12 E.(1)(a) the final report must include a scaled site and sampling diagram. A sampling diagram was provided but it is not to scale.
Submit a complete report through the OCD Permitting website by 6/7/2024. |
03/07/2024 |
The (03/07/2024, C-141) application [287687] was rejected by OCD. The operator was emailed with details of this event. |
03/07/2024 |
An application [287687] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
11/21/2023 |
The (03/07/2024, C-141) application [287687] was assigned to this incident. |
09/08/2023 |
The (09/08/2023, C-141) application [263220] was accepted by OCD. The operator was emailed with details of this event. |
09/08/2023 |
C-141 received on 9/8/2023 for release on 8/23/2023. The cause of the release was reported as “Kairos flyover reported a leak on Lateral J-2. Harvest responded to the report and found the leak at 11:00. The line was shut-in and blown down. The leak was in a wash and no liquids are present. The line was completely blown down and the leak stopped by 11:30.” |
09/08/2023 |
An application [263220] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
09/07/2023 |
The (09/08/2023, C-141) application [263220] was assigned to this incident. |
08/24/2023 |
The (08/24/2023, NOR) application [257418] was assigned to this incident. |
08/24/2023 |
Operator indicated that immediate notice was given (08/23/2023) prior to the submission of the NOR. |
08/24/2023 |
Initial Response question & answers at the time of notification were as follows. - The source of the release has been stopped: True.
- The impacted area has been secured to protect human health and the environment: True.
- Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices: True.
- All free liquids and recoverable materials have been removed and managed appropriately: True.
|
08/24/2023 |
New incident created by the operator, upon the submission of notification of release. |
08/23/2023 |
Release discovered by the operator. |