OCD Permitting

NAPP2332741544 2023 MAJOR I FLAR @ 0

General Incident Information

[fAPP2123045897] BIG EDDY UNIT 30 EAST
[373075] XTO PERMIAN OPERATING LLC.
Inactive
Amended C-129 Accepted, Operator required to follow Monthly/Annual Waste Rule reporting requirements
Flare

I-15-20S-31E      0 FNL      0 FEL
32.569914,-103.8489402 NAD83
Artesia
Eddy (15)


Severity Indicators














Notes

Industry Rep


Contact Details


Event Dates

11/22/2023
12:00 AM

11/22/2023
11:59 PM
12/7/2023

 

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Initial C-129 Report [290174] 12/01/2023 12/01/2023
Notification [288032] 11/23/2023 11/23/2023

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Equipment Failure Gas Compressor Station Natural Gas Flared 824 0 824 Mcf
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
12/01/2023 Corrective actions provided by the operator: Repair, reset , restart
12/01/2023 Steps taken to prevent waste provided by the operator: Repaired
12/01/2023 Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report.
12/01/2023 The (12/01/2023, C-129A) application [290174] was assigned to this incident.
11/23/2023 The (11/23/2023, NOMVF) application [288032] was assigned to this incident.
11/23/2023 New incident created by the operator, upon the submission of a notification of venting or flaring.
11/22/2023 The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions






Orders No Orders Found


Click to go back to top of page