01/03/2024 |
Corrective actions provided by the operator: Harvest removed and replaced the broken valve |
01/03/2024 |
Primary Equipment identified by the operator (Valve) |
01/03/2024 |
Steps taken to prevent waste provided by the operator: Upon being notified that there was a potential problem, Harvest immediately dispatched personnel to investigate. After confirming the leak, Harvest personnel immediately isolated and stopped the leak. |
01/03/2024 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
01/03/2024 |
The (01/03/2024, C-129A) application [299470] was assigned to this incident. |
12/29/2023 |
The (12/29/2023, NOMVF) application [298507] was assigned to this incident. |
12/29/2023 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |
12/29/2023 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |