06/18/2025 |
The (06/18/2025, C-141N) application [476629] was assigned to this incident. |
12/03/2024 |
Deferral denied.
Submitted report states that there is an approved work plan with a variance request to sample every 500 feet. This incident has no approved work plan or an approved sampling plan to collect samples every 500 square feet. Sampling is insufficient for this release.
Approved work plans or sampling plans for one incident are not a blanket approval for additional incidents on the same location. Two of the three releases on the submitted report occurred in 2024 and would have application IDs for work plan submittals. A quick review of all three incidents included in the report do not have a submitted workplan or approved sampling plan. If such documentation exists, the documentation will need to be included in the submitted report and state what incident it the approval was for.
Operator failed to provide proper Sampling Notification pursuant to 19.15.29.12.D.(1).(a) NMAC. Failure to provide proper sampling notice is a compliance issue and the OCD may pursue compliance actions pursuant to 19.15.5 NMAC. Operator shall ensure future compliance with 19.15.29.12.D.(1).(a) NMAC.
Operator failed to provide any notification of confirmation sampling with the exception of a C141N for 03/18/2024.
Additional sampling is required in order to meet the 200 square feet requirement for closure sampling.
Submit a report via the OCD permitting portal by January 3, 2025. |
12/03/2024 |
The (12/03/2024, C-141) application [405382] was rejected by OCD. The operator was emailed with details of this event. |
11/20/2024 |
The (12/03/2024, C-141) application [405382] was assigned to this incident. |
11/20/2024 |
Deferral request denied.
Submitted report is missing tables summarizing analytical results. It appears that the figures are placed under the "Tables" appendix and not under "Figures."
Submit a report via the OCD permitting portal by December 13, 2024. |
11/20/2024 |
The (11/20/2024, C-141) application [397765] was rejected by OCD. The operator was emailed with details of this event. |
11/20/2024 |
An application [397765] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
10/31/2024 |
The (11/20/2024, C-141) application [397765] was assigned to this incident. |
03/15/2024 |
The (03/15/2024, C-141N) application [323538] was assigned to this incident. |
02/28/2024 |
The (02/28/2024, C-141) application [318626] was accepted by OCD. The operator was emailed with details of this event. |
02/28/2024 |
C-141 received on 2/28/2024 for release on 1/17/2024. The cause of the release was reported as “The water dump on the battery separator froze causing fluid to be forced through the oil side of the separator into the oil sales tank and overfilling the sales tank and a release of approximately 20 bbls of oil onto the facility pad and adjacent pasture. Initial response recovery of fluids is to be determined.” |
02/28/2024 |
An application [318626] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
02/28/2024 |
The (02/28/2024, C-141) application [318626] was assigned to this incident. |
01/19/2024 |
The (01/19/2024, NOR) application [305809] was assigned to this incident. |
01/19/2024 |
New incident created by the operator, upon the submission of notification of release. |
01/17/2024 |
Release discovered by the operator. |