| 07/08/2024 |
Corrective actions provided by the operator: No corrective actions taken at this site. Third party took corrective actions |
| 07/08/2024 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 07/08/2024 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/08/2024 |
The (07/08/2024, C-129A) application [361607] was assigned to this incident. |
| 05/02/2024 |
The (05/02/2024, C-129) application [339932] was assigned to this incident. |
| 05/02/2024 |
Corrective actions provided by the operator: No corrective actions taken at this site. Third party took corrective actions |
| 05/02/2024 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 05/02/2024 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 05/01/2024 |
The flaring of natural gas discovered by the operator. |