| 07/10/2024 |
Corrective actions provided by the operator: Implement a scheduled maintenance program to avoid failures |
| 07/10/2024 |
Steps taken to prevent waste provided by the operator: Task is site specific but should have pre job planning meeting and look for ways to limit or avoid flaring |
| 07/10/2024 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/10/2024 |
The (07/10/2024, C-129A) application [362593] was assigned to this incident. |
| 06/05/2024 |
The (06/05/2024, C-129) application [351040] was assigned to this incident. |
| 06/05/2024 |
Corrective actions provided by the operator: Implement a scheduled maintenance program to avoid failures |
| 06/05/2024 |
Steps taken to prevent waste provided by the operator: Task is site specific but should have pre job planning meeting and look for ways to limit or avoid flaring |
| 06/05/2024 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 05/30/2024 |
The flaring of natural gas discovered by the operator. |