OCD Permitting

nAPP2420056258 20200 EXT LINE

General Incident Information

[fAPP2123031660] DCP SE NM Gathering System
[36785] DCP OPERATING COMPANY, LP
Active
Initial C-141 Approved, Pending submission of Site Characterization / Remediation Plan OR Remediation Closure Report from the operator
Blow Out

D-24-23S-31E      0 FNL      0 FEL
32.297077,-103.738636 NAD83
Artesia
Federal
Eddy (15)


Severity Indicators














Notes

Industry Rep


Contact Details


Event Dates

07/17/2024

8/1/2024

10/15/2024  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Initial C-141 Report [365475] 07/25/2024 07/25/2024
Notification [365470] 07/18/2024 07/18/2024

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Blow Out Pipeline (Any) Produced Water 7 0 7 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        

Incident Events

Date Detail
07/25/2024 The (07/25/2024, C-141) application [365475] was accepted by OCD. The operator was emailed with details of this event.
07/25/2024 An application [365475] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
07/18/2024 The (07/25/2024, C-141) application [365475] was assigned to this incident.
07/18/2024 The (07/18/2024, NOR) application [365470] was assigned to this incident.
07/18/2024 New incident created by the operator, upon the submission of notification of release.
07/17/2024 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

Remediation Plan

Have the lateral and vertical extents of contamination been fully delineated? Yes No
On what estimated date will the remediation commence?  
On what date will (or did) the final sampling occur?  
On what date will (or was) the remediation complete(d)  

Release is indicated as not yet fully delineated. Any Deferral Requests received may not be granted for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found


Click to go back to top of page