08/22/2024 |
Corrective actions provided by the operator: new piping was installed in place of the old pipe. 3 joints of pipe was replaced with new |
08/22/2024 |
Primary Equipment identified by the operator (Pipeline (Any)) |
08/22/2024 |
Steps taken to prevent waste provided by the operator: Once discovered the pipeline was shut in immediately |
08/22/2024 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
08/22/2024 |
The (08/22/2024, C-129A) application [376453] was assigned to this incident. |
08/20/2024 |
The (08/20/2024, C-141) application [375017] was rejected by OCD. The operator was emailed with details of this event. |
08/20/2024 |
An application [375017] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
08/19/2024 |
The (08/19/2024, C-141N) application [375084] was assigned to this incident. |
08/19/2024 |
The (08/20/2024, C-141) application [375017] was assigned to this incident. |
08/08/2024 |
The (08/08/2024, NOMVF) application [371900] was assigned to this incident. |
08/08/2024 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
08/07/2024 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |