09/27/2024 |
Corrective actions provided by the operator: Harvest is doing an investigation to eliminate reoccurrence. |
09/27/2024 |
Primary Equipment identified by the operator (Pipeline (Any)) |
09/27/2024 |
Steps taken to prevent waste provided by the operator: Isolation point was found as soon as possible, and line was shut in stopping the release |
09/27/2024 |
Incident updated by the operator, upon the submission of a amendment for venting of natural gas report. |
09/27/2024 |
The (09/27/2024, C-129A) application [387756] was assigned to this incident. |
09/19/2024 |
The (09/19/2024, NOMVF) application [384905] was assigned to this incident. |
09/19/2024 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
09/18/2024 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |