| 12/20/2024 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 12/20/2024 |
The (12/20/2024, C-129A) application [414371] was assigned to this incident. |
| 12/05/2024 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 12/05/2024 |
The (12/05/2024, C-129A) application [409153] was assigned to this incident. |
| 12/02/2024 |
The (12/02/2024, C-129) application [407458] was assigned to this incident. |
| 12/02/2024 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 12/02/2024 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 12/02/2024 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 11/24/2024 |
The flaring of natural gas discovered by the operator. |