| 05/09/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 05/09/2025 |
The (05/09/2025, C-129A) application [460603] was assigned to this incident. |
| 03/07/2025 |
Corrective actions provided by the operator: Repair, reset, restart |
| 03/07/2025 |
Steps taken to prevent waste provided by the operator: Repaired |
| 03/07/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 03/07/2025 |
The (03/07/2025, C-129A) application [440397] was assigned to this incident. |
| 03/02/2025 |
The (03/02/2025, NOMVF) application [438001] was assigned to this incident. |
| 03/02/2025 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 03/01/2025 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |