| 03/18/2025 |
Incident cancelled by the operator, upon the submission of a [C-129] Cancel Venting and/or Flaring (C-129C) report. |
| 03/18/2025 |
The (03/18/2025, C-129C) application [443353] was assigned to this incident. |
| 03/12/2025 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 03/12/2025 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 03/12/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 03/12/2025 |
The (03/12/2025, C-129A) application [441748] was assigned to this incident. |
| 03/03/2025 |
The (03/03/2025, NOMVF) application [438120] was assigned to this incident. |
| 03/03/2025 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 03/02/2025 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |