| 08/07/2025 |
The (08/07/2025, C-141) application [492791] was accepted by OCD. The operator was emailed with details of this event. |
| 08/07/2025 |
Reclamation approved. |
| 08/07/2025 |
An application [492791] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 08/06/2025 |
The (08/07/2025, C-141) application [492791] was assigned to this incident. |
| 06/05/2025 |
The (06/05/2025, C-141) application [464124] was rejected by OCD. The operator was emailed with details of this event. |
| 06/05/2025 |
Reclamation reports need to include the following: Executive Summary of the reclamation activities; Scaled Site Map including sampling locations; Analytical results including, but not limited to, results showing that any remaining impacts meet the reclamation standards and results to prove the backfill is non-waste containing; At least one (1) representative 5-point composite sample will need to be collected from the backfill material that will be used for the reclamation of the top four feet of the excavation. The OCD reserves the right to request additional sampling if needed; pictures of the backfilled areas showing that the area is back, as nearly as practical, to the original condition or the final land use and maintain those areas to control dust and minimize erosion to the extent practical; pictures of the top layer, which is either the background thickness of topsoil or one foot of suitable material to establish vegetation at the site, whichever is greater; and a revegetation plan. A five-point composite sample needs to be collected from the topsoil used to backfill the pasture and the backfill used on pad. These should be tested for all Table I constituents. Submit updated report to the OCD by 8/4/25. |
| 06/05/2025 |
An application [464124] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 05/16/2025 |
The (06/05/2025, C-141) application [464124] was assigned to this incident. |
| 05/07/2025 |
The (05/07/2025, C-141) application [450258] was rejected by OCD. The operator was emailed with details of this event. |
| 05/07/2025 |
Remediation closure denied for the following: 1) In the remediation summary you write: “Forty (40) subsamples were collected from the base of the excavation then combined to form eight (8) 5-point composite samples.” Explain this process. 2) On the Chain of Custody all confirmation samples are grab samples. Per 19.15.29.12(D) NMAC the remediated areas must be tested for contamination with representative five-point composite samples from the walls and base. Explain. 3) A C-141N was submitted on 3/24/25 to collect samples on 3/26/25. The chain of custody for all confirmation samples says they were collected on 3/27/25 however the date was changed by the laboratory to 3/26/25. Notes from the laboratory say: “04/04/25 - Client changed the sample date on all samples (see COC).” Explain. 4) On pg. 3 you write “Permian will reclaim the pasture area by preparing and reseeding, following the completion of all remediation activities.” Was the pasture area addressed? 5) As this release occurred both on and off pad, the remediation photographs provided should include captions describing what areas are being viewed, including the direction, dates taken and sample points shown. 6) Under the Site Characterization portion of the C-141 application, update the minimum distances to the following upon resubmittal: any other significant watercourse (1000 ft -1/2 mile to the W). Refer to topographic map on pg. 8. Submit updated remediation closure report to the OCD by 8/5/25. |
| 05/07/2025 |
An application [450258] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 04/09/2025 |
The (05/07/2025, C-141) application [450258] was assigned to this incident. |
| 03/24/2025 |
The (03/24/2025, C-141N) application [444833] was assigned to this incident. |
| 03/07/2025 |
The (03/07/2025, C-141) application [440368] was accepted by OCD. The operator was emailed with details of this event. |
| 03/07/2025 |
An application [440368] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event. |
| 03/07/2025 |
The (03/07/2025, C-141) application [440368] was assigned to this incident. |
| 03/07/2025 |
The (03/07/2025, NOR) application [440349] was assigned to this incident. |
| 03/07/2025 |
New incident created by the operator, upon the submission of notification of release. |
| 02/21/2025 |
Release discovered by the operator. |