| 05/07/2025 |
Corrective actions provided by the operator: Implement a scheduled maintenance program to avoid failures |
| 05/07/2025 |
Steps taken to prevent waste provided by the operator: Task is site specific but should have pre job planning meeting and look for ways to limit or avoid flaring |
| 05/07/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 05/07/2025 |
The (05/07/2025, C-129A) application [459729] was assigned to this incident. |
| 03/25/2025 |
The (03/25/2025, C-129) application [445443] was assigned to this incident. |
| 03/25/2025 |
Corrective actions provided by the operator: Implement a scheduled maintenance program to avoid failures |
| 03/25/2025 |
Steps taken to prevent waste provided by the operator: Task is site specific but should have pre job planning meeting and look for ways to limit or avoid flaring |
| 03/25/2025 |
New incident created by the operator, upon the submission of a venting of natural gas report. |
| 03/19/2025 |
The venting of natural gas discovered by the operator. |