| 04/14/2025 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 04/14/2025 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 04/14/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 04/14/2025 |
The (04/14/2025, C-129A) application [451502] was assigned to this incident. |
| 04/08/2025 |
The (04/08/2025, C-129) application [449467] was assigned to this incident. |
| 04/08/2025 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 04/08/2025 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 04/08/2025 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 04/04/2025 |
The flaring of natural gas discovered by the operator. |