| 07/03/2025 |
Steps taken to prevent waste provided by the operator: Monitored event real time when applicable. Shift gas to other markets when available |
| 07/03/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/03/2025 |
The (07/03/2025, C-129A) application [481471] was assigned to this incident. |
| 07/03/2025 |
Corrective actions provided by the operator: Corrective actions are not in our control and reliant on outside source(s) |
| 07/03/2025 |
Steps taken to prevent waste provided by the operator: Monitored event and volumes in real time when applicable and confirmed proper flare operating settings |
| 07/03/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/03/2025 |
The (07/03/2025, C-129A) application [481456] was assigned to this incident. |
| 06/30/2025 |
The (06/30/2025, NOMVF) application [480018] was assigned to this incident. |
| 06/30/2025 |
New incident created by the operator, upon the submission of a notification of venting or flaring. |
| 06/29/2025 |
The event discovered by the operator; will be tracked as a Flare till submission of the required subsequent C-129A. |