| 08/04/2025 |
Incident cancelled by the operator, upon the submission of a [C-129] Cancel Venting and/or Flaring (C-129C) report. |
| 08/04/2025 |
The (08/04/2025, C-129C) application [491664] was assigned to this incident. |
| 07/30/2025 |
Incident updated by the operator, upon the submission of a amendment for flaring of natural gas report. |
| 07/30/2025 |
The (07/30/2025, C-129A) application [489975] was assigned to this incident. |
| 07/29/2025 |
The (07/29/2025, C-129) application [489430] was assigned to this incident. |
| 07/29/2025 |
Corrective actions provided by the operator: No corrective actions, normal ops |
| 07/29/2025 |
Steps taken to prevent waste provided by the operator: Verify pressure settings to flare. |
| 07/29/2025 |
New incident created by the operator, upon the submission of a flaring of natural gas report. |
| 07/27/2025 |
The flaring of natural gas discovered by the operator. |