nAPP2526148806 SAN JUAN 29-7 #563S

General Incident Information
[30-039-27428] SAN JUAN 29 7 UNIT #563S

[372171] HILCORP ENERGY COMPANY
Active
Initial C-141 Approved, Pending submission of Site Characterization / Remediation Plan OR Remediation Closure Report from the operator
Oil Release

C-24-29N-07W      790 FNL      1640 FWL
36.71624,-107.52512 NAD83
Aztec
Private
Rio Arriba (39)


Severity Indicators














Notes

Industry Rep


Contact Details


Event Dates

09/15/2025

9/30/2025

03/16/2026  

Incident Dates

19.15.29 NMAC - RELEASES

Type Action Received Denied Approved
Sampling Notice [511699] 10/02/2025 10/02/2025
Sampling Notice [509756] 09/26/2025 09/26/2025
Sampling Notice [507846] 09/22/2025 09/22/2025
Initial C-141 Report [507295] 09/18/2025 09/18/2025
Notification [507279] 09/18/2025 09/18/2025

19.15.30 NMAC - REMEDIATION

Type Action Received Denied Approved

Compositional Analysis of Vented and/or Flared Natural Gas

No Compositional Analysis Found


Incident Materials

Cause Source Material Volume Units
Unk. Released Recovered Lost
Overflow - Tank, Pit, Etc. Pit (Specify) Crude Oil 12 8 4 BBL
 
The concentration of dissolved chloride in the produced water >10,000 mg/l:           Yes           No        
Cause of Release OR Additional Details provided for materials released:
Compressor drain pit was flooded due to precipitation and resulted in motor oil floating out of the tank into the bermed containment area.

Incident Events

Date Detail
12/11/2025 90-day time extension request is approved. Remediation Due date updated to March 16, 2026. Email submitted on 12/09/2025 via third party states, “On behalf of Hilcorp Energy Company, Ensolum respectfully requests a 90-day extension to the December 14, 2025, reporting deadline for the SAN JUAN 29-7 #563S (30-039-27428) release. Delineation activities are complete, and the majority of impacted soil has been excavated. During remediation, two previously permitted BGTs were found to be situated within a FEMA 100-year floodplain, an issue not accurately reflected on the original BGT permit. To maintain compliance, Hilcorp elected to close and remove both tanks prior to completing the remaining excavation. The BGT closures were recently completed, and the area is now accessible for the final removal of minor residual impacts. Hilcorp is currently scheduling a crew to complete this excavation, collect confirmation samples, and allow Ensolum to prepare the Closure Request. To accommodate contractor scheduling, laboratory turnaround, and preparation of the final report, Hilcorp requests a 90-day extension, extending the deadline to March 14, 2026".
10/02/2025 The (10/02/2025, C-141N) application [511699] was assigned to this incident.
09/26/2025 The (09/26/2025, C-141N) application [509756] was assigned to this incident.
09/25/2025 Operator and consultant cancelled sampling for 9/25/2025 at 10 AM due to pooling oil at location. Hydrovac is being sent to the site. Operator will submit a C-141N to notify sampling date and time next week.
09/22/2025 The (09/22/2025, C-141N) application [507846] was assigned to this incident.
09/18/2025 The (09/18/2025, C-141) application [507295] was accepted by OCD. The operator was emailed with details of this event.
09/18/2025 An application [507295] was submitted to OCD for review. It was submitted, indicating that it was an: [C-141] Application for administrative approval of a release notification and corrective action The operator was emailed confirmation of this event.
09/18/2025 The (09/18/2025, C-141) application [507295] was assigned to this incident.
09/18/2025 The (09/18/2025, NOR) application [507279] was assigned to this incident.
09/18/2025 New incident created by the operator, upon the submission of notification of release.
09/15/2025 Release discovered by the operator.

Incident Severity
Major release as defined by 19.15.29.7(A) NMAC?
Yes No

Incident Corrective Actions

Initial Response

The source of the release has been stopped.
The impacted area has been secured to protect human health and the environment.
Released materials have been contained via the use of berms or dikes, absorbent pads, or other containment devices.
All free liquids and recoverable materials have been removed and managed appropriately.
If all the actions described above have not been undertaken, explain why:

         


No site characterization data was found for this incident.

Remediation Plan

Have the lateral and vertical extents of contamination been fully delineated? Yes No
On what estimated date will the remediation commence?  
On what date will (or did) the final sampling occur?  
On what date will (or was) the remediation complete(d)  

Release is indicated as not yet fully delineated. Any Deferral Requests received may not be granted for this incident.

No remediation closure report data was found for this incident.

No reclamation report data was found for this incident.

No re-vegetation report data was found for this incident.

Orders No Orders Found


Click to go back to top of page